PVC Rigid Imitation Marble Board Sheet Plate Plastic Extrusion Machine
PVC marble line production line equipment UV line equipment for the production of PVC marble line line, plastic line, waist line, Angle line, stone baseline line products, select the domestic advanced extrusion equipment, heating extrusion a whole molding.
Adopt double screw extruder stone plastic product texture realistic and beautiful, super wear-resistant, bright and not slippery surface, and non-toxic environmental protection, wear-resistant, scratch resistant, but also slip, waterproof, fire prevention.
Compound PVC imitation marble lines, stone plastic lines have a multi-layer structure, the surface using UV treatment, color layer, stone plastic layer and basic composition, wear resistance, pollution resistance, dimensional stability is relatively good, and color diversity, rich, is the current market and decoration more like the line.
PVC imitation marble line production line equipment UV line production line equipment mainly consists of the following: conical twin screw plastic extruder, mold, cooling vacuum molding platform, heat transfer or water transfer after extrusion, tractor, cutting machine, turnover rack.Plus auxiliary machinery: high speed mixer, plastic crusher, plastic grinding machine and other components.
Machine list & Quotation
No. | Machine | Qty. |
1 | Screw loader for SJZ 80/156 extruder | 1 set |
2 | SJZ 80/156 conical twin-screw extruder | 1 set |
3 | T type mould | 1 set |
4 | Three roller calendar | 1 set |
5 | Temperature controller of roller | 1 set |
6 | Cooling bracket with trimming device | 1 set |
7 | Haul off | 1 set |
8 | Cutter | 1 set |
9 | Stacker | 1 set |
10 | Screw loader for mixer | 1 set |
11 | 300/600 Mixer unit | 1 set |
12 | UV coating unit | 1 set |
After-Sales Service
1 Technical documents
All the symbols on the equipments should be in English. Seller is responsible to provide general layout plan, electric plan, installation direction, and manual book in English to Buyer on time.
2. Arrangement for inspection, installation and testing work
a. After all machines are delivered to customer's factory; Buyer is responsible for all preparation work, e.g. electricity supply, water supply, labors and cranes, etc.
b. ACEMIEN will prepare for visa application for their engineers, who are responsible for guide of machine installation and testing at the Buyer's factory.
c. The Buyer will buy the round-trip air ticket for Engineer if visa application is approved. The buyer is also responsible to bear expenses generated, e.g. visa formalities, meals, accommodation and allowance of USD80 per day for each engineer.
d. Engineer will give free training lessons to labors in buyer's factory.
e. If buyer doesn't request installation and commissioning by Seller's engineer in 4 months since date of bill of lading, which to be accounted all the machines has been successfully tested by buyer.
3. Quantity and quality guarantee
a. Quantity/Quality Discrepancy to destination port during transportation:
In case of quality/quantity discrepancy to destination port in transportation, customer should file claim within 30 days after the arrival of the goods at port of destination. Insurance company and shipping company will be responsible for any discrepancy of the goods caused by shipping company and other transportation organization and/or post office.
b. Guarantee period and after-sales services: 12 months since date of bill of lading
During this guarantee period, ACEMIEN will provide spare parts without any charge in case of quality discrepancy caused by us. If the malfunctions are caused by your incorrect operations, ACEMIEN will provide the buyer spare parts at cost price.
c. Long-term service:
ACEMIEN will charge the buyer cost price of spare parts beyond one year and provide long-term technical guide.