Specifications
Brand Name :
Acemien
Model Number :
SJZ120
Certification :
CE
Place of Origin :
China
MOQ :
1SET
Price :
Negotiable
Payment Terms :
L/C, T/T, Western Union
Supply Ability :
50SETS/YEAR
Delivery Time :
45 Working days
Packaging Details :
standard wooden case or film package
Name :
Plastic recycling machinery
Thickness :
13-20mm
Size :
915*1380MM 1220*2440MM
Reuse :
over 50 times
Capaicty :
250-400kg/hour
Voltage :
220V/380V/400V/415V/440V/660V 50Hz/60Hz, 220v-380v/50hz-60hz
Warranty :
1 Year, 12 months, Any problem products coulde be changed freely
After-sales service provided :
Engineers available to service machinery overseas, Overseas third-party support available
Application :
building machine
suface : :
smoothy and glossy
Description

PP materials plastic construction formwork building hardware making machinery

1. The best toughness
Can be used to make other different shapes and size formworks.Bending strength:Lateral pressure 14Mpa , Vertical pressure 21Mpa .Bending modulus:Lateral pressure 782Mpa ,Vertical pressure 970Mpa.

2. Waterproof-hollow design
Hollow design make the formwork structural stability .Dimensional shrinkage under heat:lateral 0.15% Vertical 0.13% .Diffcult deformation, no mildew; Long-term immersion stratification in the water, no bubbles, sheet size stability, especially suitable for underground and damp environment.

3. Acid and alkali resistance, corrosion resistance
Very suitable for the engineering application in coastal areas, mine, as well as seawall. It is need not do any preservative treatment both in using and storing the formworks, which do not pollute the concrete surface.

Installation instructions:

• 1, Use the hollow building formwork intersecting surface laid with 15 mm thick.

  

• 2, Wood square of the distance :

  

• 1, On the surface of the intersection (spacing: wood square distance according to the thickness of the slab concrete, in general, the thickness of less than 0.15 m floor (spacing is 200 ~ 250 mm.

  

• 2, The shear wall (spacing: (spacing according to adjust the spacing, height and thickness of the wall to wall height of 2800 mm, 300 mm thick wall, for example, using the formwork (15 mm thickness spacing is 100 ~ 150 mm, if the shear wall, pillar width more than 1 meter, must add the fixed frame.

  

• 3, When the nail to the formwork from the formwork edge distance 15 ~ 30 mm, strength wants moderate, nail nails is 40 ~ 50 mm in length, shoulds not be too long or too short.

  

• 4, Beam bottom of a piece of wood square must set aside 15 mm seam allowance, wallboard made on wood square seam allowance, it does not leak slurry and wallboard material saving.




Features of plastic construction formwork:


Hollow Plastic Formwork Dimensions

Width x Length(mm)

Thickness

Weight(kg)
915mmx1830mm
14mm

10kg

915mmx1830mm

15mm

12kg

915mmx1830mm

18mm

13kg

1220mmx2440mm

14mm

18kg

1220mmx2440mm

15mm

20kg

1220mmx2440mm

18mm

25kg


Advantage:

Comparision of hollow plastic formwork and other formworks
Performace Hollow plastic formwork Modular plastic formwork PVC plastic formwork Plywood Bamboo ploywood Metal formwork
Wear Resistance Good Good NO NO NO NO
Corrosion Resistance Good Good NO NO NO NO
Tenacity Good Bad Bad Bad Bad Bad
Impact Strength High Easily broken Normal Poor Poor Poor
Absorbing water No defoming No deforming Deforming Deforming Deforming Deforming
Mold Release Donot need Donot need Need Need Need Donot need
Warp After using No No Yes Yes Yes Yes
Weight(kg/m2) 6 10 15 8 8 12
Recyclability Yes Yes Yes Yes Yes Yes
Bearing capacity High Easily broken Normal Normal Normal Normal
ECO-Friendly Yes Yes Yes NO NO NO
Cost of usage Cheap Expensive Expensive Expensive Expensive Very expensive
Reusable Time Over 60 times Over 60 times 20-30 times 4-6 times 7-9 times 90 times


PP Materials Formwork Building Hardware Making Machine Plastic Construction

PP Materials Formwork Building Hardware Making Machine Plastic Construction


FAQ
1.Q: Are you manufacture factory or a trader?

A: We are an industrial manufacture factory of plastic extrusion machinery for years, which locates in Zhangjiagang city, China.



2.Q: What's your payment term:


A: T/T 30% in advance & T/T 70% upon sending the copy of Bill of Lading, L/C 100%, or negotiate according to the order status.


3.Q: Can we visit your factory ?


A: Warmly welcome. Once we have your schedule, we will arrange the professional sales team to follow up your case


4. Q: How do you make the quotation for clients?


A: The price depends on quality and performance but the clients should be satisfied first.



5. Q: Do you have any after-sale service ?

A:Yes,we have professional after-sale teamwork . any technical question could be solved in 24 hours by our after-sale teamwork.



6. Q: How do you install your equipment in our factory ?

A: We have professional after-sale &installation teamwork, we will arrange our engineer fly to ur factory install and teach ur labor .

Our Packing and Shipping

PP Materials Formwork Building Hardware Making Machine Plastic Construction

Our exhibition

PP Materials Formwork Building Hardware Making Machine Plastic Construction

Send your message to this supplier
Send Now

PP Materials Formwork Building Hardware Making Machine Plastic Construction

Ask Latest Price
Brand Name :
Acemien
Model Number :
SJZ120
Certification :
CE
Place of Origin :
China
MOQ :
1SET
Price :
Negotiable
Contact Supplier
PP Materials Formwork Building Hardware Making Machine Plastic Construction
PP Materials Formwork Building Hardware Making Machine Plastic Construction
PP Materials Formwork Building Hardware Making Machine Plastic Construction

Jiangsu Acemien Machinery Co., Ltd.

Active Member
7 Years
Since 2013
Business Type :
Manufacturer, Exporter, Trading Company, Seller
Total Annual :
8,850,000-118,00,000
Employee Number :
50~100
Certification Level :
Active Member
Contact Supplier
Submit Requirement