Double Head Stud And Track Roll Forming Machine Light Keel Forming Machine
Double Head Stud And Track Roll Forming Machine Light Keel Forming Machine,which is combined with the V angle roll forming machine and the Omega roll forming machine. It can work separately Due to it has independent control system so two lines working at the same time.
Due to the characteristics of fast disassembly, time-saving and labor-saving, light weight, long service life, good stability, convenient transportation, multiple disassembly and assembly, beautiful appearance, and sturdy structure, light steel structures are widely used in daily life
Advantage
Cangzhou FMS has a long history in producing rolling machines. Decades ago, their technical experience was consolidated through a flexible hydraulic punch system called 'soft punching'. Since then, Cangzhou FMS has produced several systems to meet the constantly changing industry needs. We have a team of professionals with many years of experience and a good track record, which can bring you some advanced and innovative energy, and this is also the case.
Specification
No. | Item | Description |
1 | Coil | PL,GL,PPGL,PPGI |
2 | Raw Material Thickness | 0.4-0.8mm |
3 | Working Speed | 10-25m/min |
4 | Roller Station | 13 /16Raws |
7 | Electrical Control System | PLC (can be customized) |
8 | Drive Motor Power | 7.5 KW |
9 | Hydraulic Station Power | 5 KW |
10 | Power Supply | 380V, 60HZ, 3 PHASES |
11 | Cutting Accuracy | ±2 mm |
12 | Driving Mode | Single Chain 1 inch |
13 | Material of Shaft | 60 mm 45#steel forged |
14 | Material of Roller | 45# Steel Finish Machining, Plated Hard |
Guarantee
1. Guaranteed against malfunctions due to manufacturing defects for1 years after date of purchase except Electrical parts.
2. Repairs will not be performed even during the guarantee period in the follow circumstances
- Damage occurs due to a natural disaster
- Malfunction occurs due to user error
- Malfunction occurs due to modifications
- Malfunction occurs due to further movement or shipment after installation
Payment terms
40% in advance as down payment
60% is paid before the shipment is processed
Delivery
FOB: Tianjin Xingang Port
The Delivery Time: 30 days after the down payment is received.