Hydraulic Cutting Galvanized Steel Shutter Door Forming Machine 3 Kinds Of Holes
This machine punch 3 kinds of holes:
1st kind of hole is by puncher, hole punching offline
2nd kind of hole is by 3 kind of punching mould, hole punching online for big holes
3rd kind of hole is by cutter punching, cutting and hole punching at same time, for side 2 holes
We are the professional shutter door roll forming machine manufacturer in China, we ship shutter door roll forming machine all over the world like India, Thailand, Russia, Algeria, Qatar, Morocco, Saudi Arabia, Oman etc. Common shutter door rolling thickness from 0.7-1.2mm, material use PPGI or GI. Size can customize as customer's need.
Specification
Part details | Item Name | Specification |
Material | Raw material | Galvanized steel |
Thickness |
| |
Machine | Roller station | 14 |
Shaft diameter | 55 mm | |
Shaft material | 45# steel with 0.05mm chrome | |
Roller material hardness 30-40 HRC | Cr 12 | |
Machine size | About 4.5*0.8*1 m | |
Machine weight | About 2 ton | |
Machine color | As customer' request | |
Working speed | 8-20 m/min | |
Cutter | Hardness | 50-65 HRC |
Cutting tolerance | ± 1 mm | |
Material | Cr 12 | |
Operate | Hydraulic cutting | |
Power | Driving way | Chain 1 inch |
Main power | 4 kw | |
Pump power | 3 kw | |
Voltage | 380v/50HZ,3P or customize as customer' request | |
Control system | PLC brand | Delta made in Twaiwan |
Screen | Touchable screen | |
Language | Chinese and English or add language as customer need | |
Decoiler | Operation | Manual |
Weight capicatity | 3 ton | |
Price | Free as gift | |
Receiving table | Operation | Manual |
Length | 3 m |
Guarantee
1. Guaranteed against malfunctions due to manufacturing defects for1 years after date of purchase except Electrical parts.
2. Repairs will not be performed even during the guarantee period in the follow circumstances
- Damage occurs due to a natural disaster
- Malfunction occurs due to user error
- Malfunction occurs due to modifications
- Malfunction occurs due to further movement or shipment after installation
Payment terms
40% in advance as down payment
60% is paid before the shipment is processed
Delivery
FOB: Tianjin Xingang Port
The Delivery Time: 30 days after the down payment is received.