Full Automatic Metal Floor Deck Sheet Roll Forming Machine Production Line
The floor deck panel produced by high tensile floor decking steel roll forming machine is widely used on the construction building because of its high pitches and strong strength .It includes manual decoiler , main roll forming machine (safety guard optional) , Hydraulic cutting system ,PLC control system , output table .
Full Automatic Metal Floor Deck Sheet Roll Forming Machine Production LineSummary:
1). To design and make the best roll forming machine, we took EUROPEAN quality standard;
2). Choose the best material and components, and adopting our 17+ years experience;
3). We achieves that the machine capacity is double of the competitors;
4). The machine working speed can be 15m/min;
5) . Very easy to install and operate the roll forming machine.
Usage:
In order to keep the product shape and precision, adopts welded sheet structure, motor reducer drive, chain transmission,roller was chromed which can keep the molding plate surface smooth and not easy to be marked when it is working
Feature : Ensure stability , precision and lifetime.
Specification
Full Automatic Metal Floor Deck Sheet Roll Forming Machine Production Line | Forming steps | 22 steps |
Shaft diameter | 80mm | |
Machine stand | Individual Arch Plate | |
Machine frame | steel plate welded | |
roller material | 45#steel | |
shaft material | 45# steel with quenching and tempering | |
Work speed | 8-12m/min | |
Transport | By chains | |
Power of main machine | 22kw | |
Voltage | 380V-50HZ-3P(as required) | |
Machine dimension | 6500*1300*1100 | |
Machine weight | About 5T | |
Machine color | Yellow and blue(as required) |
Guarantee
1. Guaranteed against malfunctions due to manufacturing defects for1 years after date of purchase except Electrical parts.
2. Repairs will not be performed even during the guarantee period in the follow circumstances
- Damage occurs due to a natural disaster
- Malfunction occurs due to user error
- Malfunction occurs due to modifications
- Malfunction occurs due to further movement or shipment after installation
Payment terms
40% in advance as down payment
60% is paid before the shipment is processed
Delivery
FOB: Tianjin Xingang Port
The Delivery Time: 30 days after the down payment is received.