High Quality Shutter Door Roll Forming Machine Roller Shutter Door Machine Manufacturer
High Quality Shutter Door Roll Forming Machine Roller Shutter Door Machine Manufacturer
1.Can roll forming different kinds of shutter door slat with speed 30m/min.
2.Customized according to your shutter door slat profile drawing.
3.After roll forming, here will have a punching system. the hole design will follow your request.
4.The surface of shutter door slat will very smooth and beautiful without any scrtached on surface.
5.On the shutter door slat surface, also can embossing different kind pattern or press logo as your request.
We can follow your requests to make the machine, the profile drawings we displayed here are the model type.
Other profile sizes are also available for us.
For other profiles,please send me pictures or drawings.I will send you best offer accordingly.
Specification
1 | Suitable to process | Color steel plate |
2 | Width of the plate | 914mm/1000mm/1200mm/1220mm/1250mm |
3 | Thickness of the plate | 0.3-0.8mm |
4 | De-coiler | Manual one, can load 5 tons raw material |
5 | Rollers for forming | 16 rows |
6 | Diameter of the roller | 80mm |
7 | Rolling material | Carbon Steel 45# |
8 | Main motor power | 5.5kw |
9 | Material of the cutting blade | Cr12 mov |
10 | Hydraulic cutting power | 4kw |
11 | Processing precision | Within 1.00mm |
12 | Control system | Delta PLC control |
13 | Side panel of machine | 16mm |
14 | Main structure of the machine | 350 H steel |
15 | Weight | About 3T |
16 | Dimensions | 3.5*1.2*1.5m |
17 | Voltage | 380V 50Hz 3phases(changeable as needs) |
18 | Certificate | CE/ISO |
19 | Custom | According to customer's requirements |
Guarantee
1. Guaranteed against malfunctions due to manufacturing defects for1 years after date of purchase except Electrical parts.
2. Repairs will not be performed even during the guarantee period in the follow circumstances
- Damage occurs due to a natural disaster
- Malfunction occurs due to user error
- Malfunction occurs due to modifications
- Malfunction occurs due to further movement or shipment after installation
Payment terms
40% in advance as down payment
60% is paid before the shipment is processed
Delivery
FOB: Tianjin Xingang Port
The Delivery Time: 30 days after the down payment is received.