Roof Metal Steel Floor Deck Roll Forming Machine Line 900-1250mm
FlRoof Metal Steel Floor Deck Roll Forming Machine Line 900-1250mm | metal deck roll forming machine | 1000 decking floor machine | 1000 metal deck roll forming machine | steel floor decking machine
1000 floor deck roll forming machine popular sell in many countries, Coil width before rolling is 1220mm /1000mm. After rolling product width is 1000mm or 688mm, Material common is GI material, material thickness common between 0.8-1 mm.
Specification
Part details | Item Name | Specification |
Material | Raw material | Galvanized steel |
Thickness | 0.8-1.2 mm | |
Machine | Roller station | 25 or depend on customer' drawing |
Shaft diameter | 95 mm | |
Shaft material | 45# steel with 0.05mm chrome | |
Roller material hardness 30-40 HRC | GCr 15 | |
Machine size | About 15×2×1.3 m | |
Machine weight | About 14 ton | |
Machine color | As customer' request | |
Working speed | 8-20 m/min | |
Cutter | Hardness | 50-65 HRC |
Cutting tolerance | ± 1 mm | |
Material | Cr 12 | |
Operate | Hydraulic cutting | |
Power | Driving way | Chain 2 inch |
Main power | 15 kw * 2 | |
Pump power | 5.5 kw | |
Voltage | 380v/50HZ,3P or customize as customer' request | |
Control system | PLC brand | Delta made in Twaiwan |
Screen | Touchable screen | |
Language | Chinese and English or add language as customer need | |
Decoiler | Operation | Manual |
Weight capicatity | 5 ton | |
Price | Free as gift | |
Receiving table | Operation | Manual |
Length | 3 m | |
Price | Free as gift |
Guarantee
1. Guaranteed against malfunctions due to manufacturing defects for1 years after date of purchase except Electrical parts.
2. Repairs will not be performed even during the guarantee period in the follow circumstances
- Damage occurs due to a natural disaster
- Malfunction occurs due to user error
- Malfunction occurs due to modifications
- Malfunction occurs due to further movement or shipment after installation
Payment terms
40% in advance as down payment
60% is paid before the shipment is processed
Delivery
FOB: Tianjin Xingang Port
The Delivery Time: 30 days after the down payment is received.