Auto Double Layer Panel Roll Forming Machine Double Deck Sheet Metal Forming Machine
This Auto Double Layer Panel Roll Forming Machine Double Deck Sheet Metal Forming Machine. Compare to two seperate roll forming machine,this kind of double layer forming machine saves the space and cost. But the two layers share same transmission system, control system and cutting system. It means the two shapes of sheets can not working at same time. So the working productivity is less
than two sperate machines.
Detailed Parameters:
No. | Type | specification | |
1 | Row Material | Type | Color steel plate, galvanized plate, aluminum plate |
Feeding width | According to client's requirement | ||
Thickness | 0.3-0.8mm | ||
| Effiect width | 1000mm | |
2 | Main body | Forming roller station | Up layer: 12 stations ; Down layer: 18 stations |
Diameter of shaft | 70mm | ||
Shaft material | High grade 45# steel ( heat treatment, plated ome on surface) | ||
Roller material | High grade 45# steel | ||
frame | 300mm H Steel | ||
Frame thickenss | 18mm | ||
Working speed | 8-12 m/min | ||
Size (L*W*H) | About 8600*1550*1510mm | ||
Weight | About 6.5 tons | ||
3 | Power | Motor power | 4KW |
Hydraulic power | 4KW | ||
Voltage | 380V 50Hz 3phases or Customerization | ||
4 | PLC Contro System | Language | English and Chinese |
Brand Of PLC | Delta brand (Touch Screen ) | ||
Operation | Manual and Automatic (Two Type) | ||
Transducer | Delta brand | ||
5 | Cutting Device | Cutting Type | Hydraulic Cutting |
Blade of Cutting | Cr12 , quenching treatment | ||
Cutting Tolerance | + -1mm |
Guarantee
1. Guaranteed against malfunctions due to manufacturing defects for1 years after date of purchase except Electrical parts.
2. Repairs will not be performed even during the guarantee period in the follow circumstances
- Damage occurs due to a natural disaster
- Malfunction occurs due to user error
- Malfunction occurs due to modifications
- Malfunction occurs due to further movement or shipment after installation
Payment terms
40% in advance as down payment
60% is paid before the shipment is processed
Delivery
FOB: Tianjin Xingang Port
The Delivery Time: 30 days after the down payment is received.