Full Automatic Metal Palisade Fence Roll Forming Machine
Metal Palisade Fence Roll Forming Machine is a highly efficient equipment for producing light steel keel. It is a powerful machine with a voltage of 380V/50Hz/3Phase and a power of 7.5KW. It is also adjustable in terms of cutting length and has a hydraulic cutting type. The machine is relatively light with a weight of only 2.5T, making it very convenient to transport and store. T It is also easy to operate and maintain, ensuring that production runs smoothly. With its reliable performance and high efficiency, it is ideal for mass production.
Specification
Application | |||||
Standing seam roof is an economical, snap-together roofing system, for commercial and residential applications. Standing seam roof roll forming machine is special designed for its production. | |||||
Technical Parameters | |||||
1 | Suitable Material | PPGI Steel Coil / Galvalume Steel Coil / Aluminium Coil / Galvanized Steel Coil | |||
2 | Material Width | According to Profile Drawing | |||
3 | Material Thickness | 0.4-0.8 mm PPGI Steel Coil / 0.7-1.2 mm Aluminium Coil | |||
4 | Roll forming speed | 10-20 m/min (Exclude Cutting Time) | |||
Equipment List | |||||
1 | Hydraulic Decoiler with Breaking device is equipped for coil processing | 1 set | |||
2 | Rollformer with tooling | 1 set | |||
3 | Hydraulic cut-off machine | 1 set | |||
4 | Siemens Or Mitsubishi PLC and Touchable Screen are used for data processing and setting | 1 set | |||
5 | Automatic Seamer | 1 set |
Guarantee
1. Guaranteed against malfunctions due to manufacturing defects for1 years after date of purchase except Electrical parts.
2. Repairs will not be performed even during the guarantee period in the follow circumstances
- Damage occurs due to a natural disaster
- Malfunction occurs due to user error
- Malfunction occurs due to modifications
- Malfunction occurs due to further movement or shipment after installation
Payment terms
40% in advance as down payment
60% is paid before the shipment is processed
Delivery
FOB: Tianjin Xingang Port
The Delivery Time: 30 days after the down payment is received.