Multi RibsTrapezoidal Sheet Wall Roof Roll Forming Machine Work Automatically
.Multi RibsTrapezoidal Sheet Wall Roof Roll Forming Machine Work Automatically.Roofing sheet making machine has a big range of metal sheet profiles. It includes trapezoidal panel, corrugated panel, roof tile panel, metal deck panel, standing seam panel, K span panel and ridge cap. Its products are widely used in roof and wall system in workshop construction and housing construction.
The normal machinable thickness range of our roof panel roll forming machine is 0.2mm-0.8mm, the standard or more used in international market is Gauge 26 (0.45-0.5mm), working raw material is Aluminum, PPGI, Galvanized steel, Galvalume steel etc. We confirm machine's configuration according to your drawing, specially the pitch and height of each wave.
Specification
Application | |||||
Metal trapezoidal roof is widely used for commercial metal buildings, associated with residential and commercial. Trapezoidal roof roll forming machine is special designed for its production. | |||||
Technical Parameters | |||||
1 | Suitable Material | PPGI Steel Coil / Galvalume Steel Coil / Embossed Aluminum Coil | |||
2 | Material Width | 914 / 1000 / 1200 / 1220 / 1250mm | |||
3 | Material Thickness | 0.3-0.8 mm | |||
4 | Roll forming speed | 10-20 m/min (Exclude Cutting Time) | |||
Equipment List | |||||
1 | Hydraulic Decoiler with Breaking device is equipped for coil processing | 1 set | |||
2 | Rollformer with tooling | 1 set | |||
3 | Hydraulic cut-off machine | 1 set | |||
4 | Run out table or automatic stacking device | 1 set | |||
5 | Siemens Or Mitsubishi PLC and Touchable Screen are used for data processing and setting | 1 s |
Guarantee
1. Guaranteed against malfunctions due to manufacturing defects for1 years after date of purchase except Electrical parts.
2. Repairs will not be performed even during the guarantee period in the follow circumstances
- Damage occurs due to a natural disaster
- Malfunction occurs due to user error
- Malfunction occurs due to modifications
- Malfunction occurs due to further movement or shipment after installation
Payment terms
40% in advance as down payment
60% is paid before the shipment is processed
Delivery
FOB: Tianjin Xingang Port
The Delivery Time: 30 days after the down payment is received.