Double Layer Ibr Steel Roofing Sheet Roll Forming Machine Manufacturer
To save space and save money, some customer like to choose double layer roll forming machine, double layer roll forming machine popular sell in many countries, 2 shapes make in one machine, common it include:
1. Trapezoidal sheet and trapezoidal sheet double layer machine
2. Trapezoidal sheet and corrugated sheet double layer machine
3. Corrugated sheet and corrugated sheet double layer machine
4. Trapezoidal sheet and glazed tile sheet double layer machine
5. Corrugated sheet and glazed tile sheet double layer machine Please noted that double layer machine only can work one layer one time, can not 2 layer work at same time,
Part details | Item Name | Specification | Material | Raw material | Galvanized steel or PPGI | Thickness | 0.3-0.8 mm | Machine | Roller station | Depend on customer' drawing | Shaft diameter | 70 mm | Shaft material | 45# steel with 0.05mm chrome | Roller material hardness 30-40 HRC | 45# steel with 0.05mm chrome | Machine size | About 6×1.5×1.3 m | Machine weight | About 7.5 ton | Machine color | As customer' request | Working speed | 8-20 m/min | Cutter | Hardness | 50-65 HRC | Cutting tolerance | ± 1 mm | Material | Cr 12 | Operate | Hydraulic cutting | Power | Driving way | Chain 1 inch | Main power | 7.5 kw | Pump power | 4 kw | Voltage | 380v/50HZ,3P or customize as customer' request | Control system | PLC brand | Delta made in Twaiwan | Screen | Touchable screen | Language | Chinese and English or add language as customer need | Decoiler | Operation | Manual | Weight capicatity | 5 ton | Receiving table | Operation | Manual | Length | 3 m | Price | Free as gift | | |
Guarantee
1.Guaranteed against malfunctions due to manufacturing defects for1 years after date of purchase except Electrical parts.
2. Repairs will not be performed even during the guarantee period in the follow circumstances
- Damage occurs due to a natural disaster
- Malfunction occurs due to user error
- Malfunction occurs due to modifications
- Malfunction occurs due to further movement or shipment after installation
Payment terms
40% in advance as down payment
60% is paid before the shipment is processed
Delivery
FOB: Tianjin Xingang Port
The Delivery Time: 30 days after the down payment is received.
