Roofing Standing Seam Roll Forming Machine For Nail Strip Snap Lock Panel
Roofing Standing Seam Roll Forming Machine For Nail Strip Snap Lock Panel,roofing sheet standing seam profile roll forming machine has different types which used together with corrugated sheet and IBR sheet, or glazed tile sheet,selflock roof machine.The standing seam roof sheet is widely used in many kinds of industrial factory, civilian buildings, and Roof board for attached part product It has advantage of pretty appearance, durable using and so on.
Specification
No. | Roofing Standing Seam Roll Forming Machine For Nail Strip Snap Lock Panel | |
1 | Suitable to process | Color alu-zinc steel coil/Aluminium Coil |
2 | Roller | 16Rows |
3 | Dimensions | 7.0*1.3*1.55m |
4 | Motor Power | 7.5Kw |
5 | Pump Station Motor | 5.5Kw. |
6 | Thickness of the plate | 0.6-1.2mm |
7 | Productivity | 10-15m/min |
8 | Material of the cutting blade | Cr12,Quenched treatment 58℃-60℃ |
9 | Diameter of the roller | Φ90mm |
10 | Weight | About 4800kgs |
11 | Main structure of the machine | 400H beams |
12 | Processing precision | Within 1.0mm |
13 | Side panel of machine | 20mm |
14 | Chain Wheel and Cycle Chain | 1 Inch |
15 | Voltage | 380V 50Hz 3phases or as customer's need |
16 | Control system | PLC control (Delta) |
17 | Frequency system | Delta |
18 | Drive mode | Motor driver |
19 | Touch screen | Delta |
20 | Rolling materials | 45# forging steel with chromium plate |
21 | Length Tolerance | ±2mm |
Guarantee
1. Guaranteed against malfunctions due to manufacturing defects for1 years after date of purchase except Electrical parts.
2. Repairs will not be performed even during the guarantee period in the follow circumstances
- Damage occurs due to a natural disaster
- Malfunction occurs due to user error
- Malfunction occurs due to modifications
- Malfunction occurs due to further movement or shipment after installation
Payment terms
40% in advance as down payment
60% is paid before the shipment is processed
Delivery
FOB: Tianjin Xingang Port
The Delivery Time: 30 days after the down payment is received.