Metal Trapezoid Roof Sheet Roll Forming Machine Automatic Lines
Metal Trapezoid Roof Sheet Roll Forming Machine Automatic Lines is the equipment that mainly produces trapezoidal sheet. Trapezoidal plates are very common in our daily lives. You can see that they are used in various fields, such as workshop, warehouse, carport, wall board, portable house, then why is it so widely used? Compared with traditional tiles, it has many advantages, such as light weight, high strength, heat insulation, easy installation, bright colors and waterproof, but at the same time it also has some small defects, such as sound insulation because of its thin thickness. The effect is relatively poor, and the ability to resist wind and cold is relatively poor, and it is easy to rust after a long period of rain and it is not easy to recycle.
Specification
No. | Metal Trapezoid Roof Sheet Roll Forming Machine Automatic Lines | |
1 | Material | Gi,Gl, PPGL, PPGI |
2 | Roller | Chrome Plated |
3 | Thickness of material | 0.3-0.8mm or as your needs |
4 | Blade | Cr12 |
5 | Electrical control system | PLC control system |
6 | Countries Serviced | More Than 200 Countries |
7 | Dimension | 7500x1500x1920mm |
8 | Weight | About 4 Tons |
9 | Voltage | 380V 3phase 50Hz or as the customer's requirements |
10 | Material of roller | High grade 45# forged steel plated with hard chrome plating |
11 | Material of cutting | Cr12 mould steel with quenched treatment |
12 | Specification | 9.5*1.45*1.5 |
Guarantee
1. Guaranteed against malfunctions due to manufacturing defects for1 years after date of purchase except Electrical parts.
2. Repairs will not be performed even during the guarantee period in the follow circumstances
- Damage occurs due to a natural disaster
- Malfunction occurs due to user error
- Malfunction occurs due to modifications
- Malfunction occurs due to further movement or shipment after installation
Payment terms
40% in advance as down payment
60% is paid before the shipment is processed
Delivery
FOB: Tianjin Xingang Port
The Delivery Time: 30 days after the down payment is received.