Down Pipe Roll Forming Machine Hydraulic Cutting
Downspout roll forming machine
1.Put all necessary parts on the right location,make the ground falttening.
2.Connect electric wires,use 6-8 mm² support line and keep grounding.
3.Fill hydraulic oil in the pump.not too full,three quarters are ok.
4.Feed raw materil into the machine slowly,make it run smoothly then automatic.
5.Pay attention to final sheet collection,do not scretch it or hurts people.
Description of application effect
1.The whole line working speed is about 15m/min.,max working speed could be 30-50 meters per minute.
2.Feeding material width should be confirmed before machine design .the width are changeable,
3.Material thickness normal range are 0.4-0.6mm.if you have any special request on material thickness,we should discuss in advance .
4.Both three and four waves are suitable for the line.we can design the machine based on buyer's profile drawing.
5.Final sheet embossing is available.we can different embossing rollers on various pattern and drawings.
6.Hydraulic pre-cutting are provided.
Machine Specifications | |
---|---|
Weight | About 5000kgs |
Size | About 11m x 1.2m x 1m (length x width x height) |
Color | Main color: blue |
Warning color: yellow | |
Suitable Raw Material | |
Material | Galvanized Steel Coils |
Thickness | 0.5-0.8mm |
Coil width | 325mm |
Yield Strength | 235Mpa |
Main Technical Parameters | |
Quantity of forming rollers stations | 20-22 |
Diameter of forming rollers shafts | 60mm |
Roll Forming Speed | 8-12m/min |
Forming rollers material | No.45 steel, coated with chromed treatment |
Cutter material | CR12 mould steel, with quenched treatment |
Controlling system | PLC and Converter |
Electric Power requirement | Motor of roll forming machine: 5.5kw |
Motor of sawing cutter: 3kw | |
Motor of elbow machine: 1.5kw |
Guarantee
1.Guaranteed against malfunctions due to manufacturing defects for1 years after date of purchase except Electrical parts.
2. Repairs will not be performed even during the guarantee period in the follow circumstances
- Damage occurs due to a natural disaster
- Malfunction occurs due to user error
- Malfunction occurs due to modifications
- Malfunction occurs due to further movement or shipment after installation
Payment terms
40% in advance as down payment
60% is paid before the shipment is processed
Delivery
FOB: Tianjin Xingang Port
The Delivery Time: 30 days after the down payment is received.