Metal Floor Deck Steel Roll Forming Machine Hydraulic Cutting
Metal Floor Deck Steel Roll Forming Machine Hydraulic Cutting.The floor deck panel produced by high tensile floor decking steel roll forming machine is widely used on the construction building because of its high pitches and strong strength .It includes manual decoiler , main roll forming machine (safety guard optional) , Hydraulic cutting system ,PLC control system , output table .
Specification
Type | specification | ||
1 | Row Material | Type | Color steel plate, galvanized plate, aluminum plate |
Feeding width | 1220mm | ||
Thickness | 0.8-1 mm | ||
| Effiect width | 1000mm | |
2 | Main body | Forming roller station | 26 Stations |
Diameter of shaft | 90mm | ||
Shaft material | 40Cr, Numerical Control Machining To HRC28-32, Then Polishing and Hard Plating | ||
Roller material | GCr15# Steel , Heat Treatment to HRC58-60,Then Polishing and Hard Plating | ||
frame | 400mm H Steel | ||
Frame thickenss | 20mm | ||
Working speed | 8-12 m/min | ||
Size (L*W*H) | About 15200*1850*1510mm | ||
Weight | About 16.5 tons | ||
3 | Power | Motor power | 11KW+11KW |
Hydraulic power | 5.5KW | ||
Voltage | 380V 50Hz 3phases or Customerization | ||
Drving Way | By Chain | ||
4 | PLC Contro System | Language | English and Chinese |
Brand Of PLC | Delta brand (Touch Screen ) | ||
Operation | Manual and Automatic (Two Type) | ||
Transducer | Delta brand | ||
5 | Cutting Device | Cutting Type | Hydraulic Cutting |
Blade of Cutting | Cr12 , quenching treatment | ||
Cutting Tolerance | + -1mm |
Guarantee
1. Guaranteed against malfunctions due to manufacturing defects for1 years after date of purchase except Electrical parts.
2. Repairs will not be performed even during the guarantee period in the follow circumstances
- Damage occurs due to a natural disaster
- Malfunction occurs due to user error
- Malfunction occurs due to modifications
- Malfunction occurs due to further movement or shipment after installation
Payment terms
40% in advance as down payment
60% is paid before the shipment is processed
Delivery
FOB: Tianjin Xingang Port
The Delivery Time: 30 days after the down payment is received.