Vietnam Fixed Type Roof Panel Roll Forming Machine Seam-Lok PLC-Controlled
Vietnam Fixed Type Roof Panel Roll Forming Machine Seam-Lok PLC-Controlled.One of machines that creates Concealed Fastener Roofs which are aesthetically pleasing and are popular in residential and commercial applications. Rollers and shearing die-set are especially designed to create these great Screwless Roofing Roll Forming Machine. There are a wide range of Standing Seam Panel Roll Forming Machine we have made, two common types are Mechanical Seam Panels (including crimping tools) and Locking Seam Panels (Snap Lock – the seams are locked by a simple snapping of the panels together). Special crimping tools: Electric Seamer (can run forward and reverse – Backward running, or retro running), Hand Crimper
Specification
Application | |||||
Standing seam roof is an economical, snap-together roofing system, for commercial and residential applications. Standing seam roof roll forming machine is special designed for its production. | |||||
Technical Parameters | |||||
1 | Suitable Material | PPGI Steel Coil / Galvalume Steel Coil / Aluminium Coil / Galvanized Steel Coil | |||
2 | Material Width | According to Profile Drawing | |||
3 | Material Thickness | 0.4-0.8 mm PPGI Steel Coil / 0.7-1.2 mm Aluminium Coil | |||
4 | Roll forming speed | 10-20 m/min (Exclude Cutting Time) | |||
Equipment List | |||||
1 | Hydraulic Decoiler with Breaking device is equipped for coil processing | 1 set | |||
2 | Rollformer with tooling | 1 set | |||
3 | Hydraulic cut-off machine | 1 set | |||
4 | Siemens Or Mitsubishi PLC and Touchable Screen are used for data processing and setting | 1 set | |||
5 | Automatic Seamer | 1 set |
Guarantee
1. Guaranteed against malfunctions due to manufacturing defects for1 years after date of purchase except Electrical parts.
2. Repairs will not be performed even during the guarantee period in the follow circumstances
- Damage occurs due to a natural disaster
- Malfunction occurs due to user error
- Malfunction occurs due to modifications
- Malfunction occurs due to further movement or shipment after installation
Payment terms
40% in advance as down payment
60% is paid before the shipment is processed
Delivery
FOB: Tianjin Xingang Port
The Delivery Time: 30 days after the down payment is received.