Steel Sheet Slitting Line Machine For Metal Simple Automatic
Steel Sheet Slitting Line Machine For Metal Simple Automatic
1. The slitting machine adopts an integrated base and a separate transmission structure, which can effectively improve the rigidity of the mechanical structure, while reducing the vibration amplitude of the slitting blade and improving the quality of the finished product. 2. The amplitude accuracy of the reference plane of the slitter axis is within 0.006mm, which can better extend the service life of the tool and the accuracy of the finished copper strip. 3. slitting machine adopts a hydraulic adjustable back pressure combination to stabilize the pressure, which automatically rises with the increase of the coil diameter, and always effectively presses the steel coil, which is beneficial to improve the cutting accuracy of the copper strip.
Detailed information:
1) Motor decoiler | |
Motor: | 5.5kw |
Capacity (Max): | 8 Tons |
Inner diameter | 450-550mm |
Coil Width (Max.): | 1250mm |
2) Coil transmission | |
Transport roller: | 45# forge steel, quenched and chrome coated 0.05mm |
Width of roller: | 1500mm |
Motor power: | 3KW |
3) slitting part | |
Disc slitting blade | |
Number of disc blade: | 11groups |
Material of disc blade: | Cr12mov |
Material of main shaft: | steel and Rubber covered |
Slitting speed: | 20-30m/min |
Motor power: | 11KW |
Scrape recoiler | |
Rotary according to slitting device |
4) Recoil system with correcting device | |
Expanding: | hydraulic |
Capacity: | 5 Tons |
Hydraulic power: | 5.5KW |
Motor power: | 7.5KW |
Inner diameter | 450-550mm |
Recoiler width | 50-1250mm(adjustable) |
Automatic recoil with correcting device |
5) Electrical control cabinet | |
Electrical system: | PLC Panasonic 380V, 50HZ, 3 phase(also depend on customer demand) |
Transducer | YASKAWA, made in Japan |
Weight | 10.5 tons |
Production area | 18.5x3.5x2.1meters |
Guarantee
1. Guaranteed against malfunctions due to manufacturing defects for1 years after date of purchase except Electrical parts.
2. Repairs will not be performed even during the guarantee period in the follow circumstances
- Damage occurs due to a natural disaster
- Malfunction occurs due to user error
- Malfunction occurs due to modifications
- Malfunction occurs due to further movement or shipment after installation
Payment terms
40% in advance as down payment
60% is paid before the shipment is processed
Delivery
FOB: Tianjin Xingang Port
The Delivery Time: 60 working days after the down payment is received.