Standing Seam Roofing Panel Roll Forming Machine 1"13/4"Metal Snap Lock Making Machine
Standing Seam Roofing Panel Roll Forming Machine 1"13/4"Metal Snap Lock Making Machine is used to make unexposed screw roof sheet.
Firstly, the standing seam roof panels have a concealed fixing or seaming method by turning up the edges of two adjacent panels, and then folding or interlocking them. In this way, the seaming or fixing parts are invisible, and therefore sometimes we called the panels concealed fixing panels!
The material thickness varies from 0.4-0.9mm,in some places such as USA,they use copper as raw material. But some other concealed fix standing seam roofing, likebemo roof sheet are thicker from 0.8-1.2mm.
1 | Material Width | 290-600mm |
2 | Effective Width | 220-530mm |
3 | Thickness of Coil | 0.5-0.8mm |
4 | Application | standing seam roof panel |
5 | Estimated Dimension | 1500mmX1100mmX1200mm |
6 | Total Weight | 1.9 Tons |
7 | Main Power | 4.5KW |
8 | Decoiler | Manual or Hydraulic Decoiler |
9 | Inner Diameter | 508mm |
10 | Outer Diameter | 600 |
12 | Forming Speed | 0-11m/min |
13 | Forming Station | 6 stations |
14 | Bracket | Welded with 36 # I-steel |
15 | Material of Shaft | High Grade forged 45# Steel with 1st Rough Finished and then 2th Refined Finished |
16 | Diameter of the Roll | 60mm
|
17 | Material of Roller | High Quality Cr12 Quenched HRC58-62 ° |
18 | Processing Technology | Rough Processing ---Refined Processing--Hard Chromium Plating. |
19 | Material of Rack | Complete Welded Structure of A3 Steel Plate 20 mm Thickness |
20 | Transmission | Chain driving |
21 | Material of cutting blade | Cr12 with Quenched Treatment 60-62 ° |
22 | Cutting system | Hydraulic Stop or Tracking Cutting |
23 | Voltage | 380V/50HZ/3 Phase or as Customer Require |
Guarantee
1. Guaranteed against malfunctions due to manufacturing defects for1 years after date of purchase except Electrical parts.
2. Repairs will not be performed even during the guarantee period in the follow circumstances
- Damage occurs due to a natural disaster
- Malfunction occurs due to user error
- Malfunction occurs due to modifications
- Malfunction occurs due to further movement or shipment after installation
Payment terms
40% in advance as down payment
60% is paid before the shipment is processed
Delivery
FOB: Tianjin Xingang Port
The Delivery Time: 30 days after the down payment is received.