High Accuracy Double Layer Steel Roof Sheet Roll forming Machine IBR Corrugated Glazed
Manual decoiler- Roll forming machine- PLC control- Hydraulic system - Post cut- Stacking
1.The main parts: roll forming machine; molding press; cutting machine; PLC computer control; hydraulic system.
2. The machine is stable, with no noise, no shake.
3. Controlling by computer, PLC display, the operation is easy, running is steady and reliable, endurable.
4. Cutting machine is characterized by stable driving, easy operation.
5. The hydraulic system uses the CDF-10 hydraulic pump, long operating life, no noise.
6. Material: galvanized, colored steel or aluminum coil.
7. We can make and design the kinds of roll forming machines according to customer's requests
Suitable Material | Colored or galvanized steel coil, HRB60 or equivalent |
Thickness Range | 0.3-0.8 mm |
Material yield stress | 230~550 Mpa |
Roller driven type | Chain transmission |
Hydraulic system pressure | 12 Mpa |
Hydraulic station motor power | 4 Kw |
Main motor power | 4Kw |
Coil Width Range | 914, 1000, 1220 or 1250 mm.(According to your actual drawing.) |
Electric Power | 380V, 50 Hz, 3 phase(or according to your need) |
Dimension | About 6500*1300*1300mm(L*W*H), as per the drawing |
Production Capacity | 8-15 m/min |
Roller material | 45# steel with chrome treatment |
Payment term
TT, you should pay 30% as the deposit on the order day, then pay 70% before delivery when you inspect goods well in factory or by video
Warranty
24 months, and lifelong technical support service
Installation
If you need, we will send one technician to your factory to install & testing the machine. You should assist the technician to get Visa and pay for flight tickets and local accommodation, and pay 120 USD/day for salary.
Packing and shipping details
1. Need one 40ft container.
2. Fit for ocean shipping.
3. The main body of the roll forming machine will be naked packing into the container, covered with plastic film.
4. Steel wire fixes the machine into the container, in case of any damage when shaking on the sea.
5. The spare parts will be packed into the carton box.
6. The received goods table put into a carton box.
7. Manual decoiler naked package.