SLZK series clean operating room combined air conditioning unit
SLZK series clean operating room combined air conditioning unit indoor installation
According to the different installation positions of the indoor unit and outdoor unit, an oil return bend must be set on the gas pipe.



- All types of air conditioning units should be installed on a horizontal foundation.
- There should be sufficient space around the unit, especially on the side of the unit piping and the maintenance door of the fan and motor, so as to facilitate the daily inspection and regular maintenance of the unit.
- The condensate outlet must be connected to a U-shaped water seal before connecting with the outer pipe.
- When taking over the welding, make a good protection between it and the box body, so as not to burn the box body.
- The motor of the air-conditioning unit should be on a power source with overload protection and grounding protection.
- A flexible connection should be adopted between the air conditioning unit and the external air duct to avoid the transmission of vibration.
