B35AR300 belongs to electrical steel (silicon steel sheet, silicon steel sheet), the thickness is 0.35, the iron loss P15/50 W/kg is not more than 3, and the stacking coefficient is not less than 95%.Application for full process cold rolled non-oriented electrical steel strip.
Yield Rp0.2 (MPa) | Tensile Rm (MPa) | Impact KV/Ku (J) | Elongation A (%) | Reduction in cross section on fracture Z (%) | As-Heat-Treated Condition | Brinell hardness (HBW) |
---|---|---|---|---|---|---|
892 (≥) | 316 (≥) | 13 | 31 | 34 | Solution and Aging, Annealing, Ausaging, Q+T,etc | 433 |
Temperature (°C) | Modulus of elasticity (GPa) | Mean coefficient of thermal expansion 10-6/(°C) between 20(°C) and | Thermal conductivity (W/m·°C) | Specific thermal capacity (J/kg·°C) | Specific electrical resistivity (Ω mm²/m) | Density (kg/dm³) | Poisson’s coefficient, ν |
---|---|---|---|---|---|---|---|
43 | - | - | 0.34 | - | |||
885 | 548 | - | 11.3 | 323 | - | ||
171 | - | 44 | 12.2 | 122 | 132 |
Produc Forms : Sheet, plate, Coil , Strip
Q: Would you provide samples For free?
A: Yes . with on stock specification We provide samples For Free . Freight charge collect
Q:What information should i provide to source for the right products ?
A: Material grade, width, thickness, coating and Purchase quantity , Expected lead time ,etc
Q: What are the shipping ports?
A: Under normal circumstances, we ship from Shanghai, Tianjin, Qingdao, Ningbo ports, you
can choose other ports according to your needs.
Q: About product prices?
A: Prices vary from period to period due to cyclical changes in the price of raw materials.
Q: How long does your delivery time take?
A: In general, our delivery time is within 5-45 days, and may be delayed if the demand is extremely
large or special circumstances occur.
Q: Can I visit your location?
A: Of course, we welcome customers from all over the world to visit our factory. However, some
of the plants are not open to the public.
Q: Does the product have quality inspection before loading?
A: Of course, all our products are strictly tested for quality before packaging, and unqualified
products will be destroyed.We provide All original Mill test certificate and support third party inspection.
Q: How to pack the products?
A: The inner layer has a waterproof paper outer layer with iron packaging and is fixed with a fumigation
wooden pallet. It can effectively protect products from corrosion during ocean transportation.
Q: What is your working time?
A: In general, our online service time is Beijing time: 8:00-22:00, after 22:00,
we will reply to your inquiry during the next working day.