Prefabricated Flat Pack Steel Frame Modular Sandwich Panel House
Ⅰ. Modular Sandwich Panel House
Ⅱ. Details
Item | Specification | |
Part 1 | Roof System | |
i | Ceiling | 0.4mm thickness shaped steel plate |
ii | Insulation | 50 mm glass wool insulation material |
iii | Roof Purlin | 1pc 40x80mm Galvanized Square tube + 2pcs 40x60mm Galvanized Square tube + 5pcs 40x80mm Galvanized Square tube |
iv | Roof Plate | 0.5 mm thickness steel sheet |
Part 2 | Floor System | |
i | Floor Purlin | 10pcs 40x80mm Galvanized Square tube + 4pcs 40x80mm Galvanized Square tube + 2pcs 30x50mm Galvanized Square tube |
ii | Floor Board | 18 mm MGO board with PVC floor leather |
Part 3 | Steel Frame | |
i | Corner Connection Part | 160* 160* 160 mm (Bottom) & 160* 160* 180 mm (Top); 4 mm Thickness Shaped Steel |
ii | Column | 160* 160* 2480mm; 2.3mm Thickness galvanized steel structure |
iii | Top and Floor Long Beam | 5680* 60* 160 mm; 2.3mm Thickness galvanized steel structure |
iv | Top & Floor Short Beam | 2680* 60* 160 mm; 2.3mm Thickness galvanized steel structure |
Part 4 | Drainage system | |
i | Water drain pipe and channel | Water drain pipe: Diameter: 50mm, length: 2700mm; Water drain channel: 90(W)x50(H)mm |
Part 5 | Door & window system | |
i | Door | 930mm*2000mm, sandwich panel/steel door |
ii | Window | 930mm*1200mm, plastic steel single glass sliding window (including screens) With 0.35mm Double glass and strength pvc window frame/Glass Window |
Part 6 | Accessories | Sealing Strip; Lock; Joints Cover; Waterproof Tape; Sealant; Structure Adhesive; Screws |
Part 7 | Electric System | LED energy saving lamp; Two sockets and one switch; electric wire and conduit; Air Circuit Breaker |
Ⅲ. Project Cases
Ⅳ. FAQ
1. How to install the houses in the site?
We can offer you three type of insisting on the installation:
1.1 : We can offer you the manual include the photos and drawings, or some videos for help you on the installation. And you will organize the local people to install it. 93% of our clients finished their houses in this way.
1.2: We can send our people to your site to guide your people to install. Or send team people (3-5 people) to your site to install for you. This way is most easy way, but you need to pay their round-way tickets, local food, accommodation, transportation, communication and salary, and also their security on the site. Almost 5% of our clients choose this way.
1.3: You can send your people (engineers or the technician) to our company to study the installation details. 2% of our clients choose this way for their orders.