Pre Engineered Metal Steel Structure Warehouse
In your eyes, what is the purpose of the warehouse? Is it just simple storage of all kinds of miscellaneous waste products?
However, in the face of different requirements of the nature of work, the warehouse design requirements are more and more.
The design of a warehouse is different according to its use. For different companies and enterprises,
their requirements for anti-theft of warehouses are gradually increasing, or their requirements for moisture-proof and sun protection are increasing.
If you consider this problem, I suggest you choose our pre engineered warehouse.
First of all, the general warehouse design, design, and structure are simple, the use of time is also short.
The most common warehouse only considers the waterproof and sunscreen function, and our company's steel structure warehouse,
just meet your requirements. Steel is the main material, not only to a certain extent, to ensure the stability of the warehouse.
Secondly, when you need a temporary warehouse building or a permanent warehouse, you need to consider it.
Is the nature of your work temporary or fixed?
This also affects the design and budget of your warehouse. If you are a temporary construction unit on the construction site,
the temporary warehouse is also one of the necessary equipment. In order to prevent unnecessary items from being lost,
the importance of building a temporary warehouse is highlighted.
You don't have to worry about product mobility. About our company's steel structure warehouse,
its disassembly and transportation are very convenient. In the process of moving, it will not occupy a lot of space.
It is a good choice for temporary construction units.
Finally, about our company's product quality, you can rest assured to buy.
Our company is a company engaged in steel products for decades. The reputation in the industry is also obvious to all.
You only need to assemble the goods according to the drawings after receiving them, and then you can use them.
In the process of assembly, it won't take you too much time. According to the size of the warehouse, generally, 3-10 people,
one or two days to complete. Our product quality is in line with the relevant standards. It is generally used for about 20 years.
If you don't want to continue to use the warehouse, you can tear it down and rebuild it. It will not pollute the environment.
Main Product | Steel structure, steel building |
Steel Frame | H .C ,Z ,T beam , Material grade :Q235B Q345B or as request. |
Column & Rafter | Welded or Hot rolled H-section |
Door | Rolled shutter door or Sliding door |
Wall & Roof | EPS, Rockwool, PU sandwich, corrugated steel sheet |
Window | Plastic steel or Aluminum alloy window |
Surface | Shot blasting with anti rust paint or hot dip galvanize(More RAL color as per request) |
Crane | 5MT, 10MT, 15MT, etc. |
Production Lines | 2 production lines of light steel, heavy steel, space frame and tube truss. |
Equipment | NC pipe cutting machine, CNC hydrauic shearing machine, Hydraulic sheet metal blending machine, Gantry submerged arc welding machine, Corrugated sheet molding machine, Shot blasting machine, Punching machine,Drilling Machine, Forging machine, H-section assembly machine,Straightener,H beam 3D drilling Machine etc. |
Dimensions | According to your requirements |
Quality Control | The third party ,SGS, all accept |
Lead Time | 25-30 days |
OEM&ODM | Service, We can quote according to your drawings |
Pre-Sales Service | 1. Consultant service (Answering client's questions) 2. Primary design plan (Free) 3. Assisting client to choose suitable construction plan 4. Price calculation 5. Business & technology discussion |
Sale Service | 1. Submission of support reaction data for foundation 2. Submission of construction drawing 3. Providing requirements for embedding 4. Construction Manual 5. Fabrication & Packing 6. Statistical table of material 7. Delivery on time 8. Other requirements by Clients |