Two Story Modular Buildings Container House As Camp
Before confirming a new camp, there are many uncertainties. For example, it is uncertain how long the construction period will be and how many workers will be needed. In this way, how can we allocate investment more reasonably during the first investment in workers' accommodation and office.
Therefore, at this time, if it can be constructed in phases, and the connected boxes can be randomly added according to the increase in the number of people, the office and accommodation units can be expanded.
This is the benefit of modular buildings.
And he also has quick assembly, a larger area, allows workers to relax and recover after a long day in clean, comfortable rooms or recreation areas while their basic needs are met.
How to install container house?
The container house installation is very simple, and we will provide installation guidance services. In K-Home, you can get CAD installation drawings, installation videos and manuals with illustrations and texts. Our technical staff will be available 24 hours a day, and the problem will be solved in time.
If your team does not have any container house installation experience, don't worry, we can provide detailed installation methods and instructions.
We have installation teams in many countries. They have rich experience in container house installation. You can also contact us to check if there is our container housing installation team in your country. If necessary, we can also send our local engineers to your country to train the installation team for you.
What is container camp?
Usually in remote area, so need to build temporary housing to accommodate shift workers.
So also means this house for temporary use.
Our container house is the best choice for you. Pls check the detail as below:
Item | Specification | |
Part 1 | Roof System | |
i. | Steel frame | Steel frame is Q235 galvanized fitting; |
ii. | Roof insulation | Ceiling is blue color steel pre-coated 0.4mm outside strong steel sheet; With 50mm glass wool insulation material; |
iii. | Roof ceiling | Ceiling is shaped steel plate with different pattern |
Part 2 | Floor System | |
i. | Steel frame | 3mm Galvanized Steel for main structure + 1.5mm square tube for secondary beam |
ii. | Floor | 15mm chipboard + PVC leather floor |
Part 3 | Column System | |
i | Column | 2.5mm Shaped Galvanized Steel |
Part 4 | Sandwich Wall System | |
i | Wall Panel | 50mm EPS Foam Sandwich Panel ; Outside color is light silver gray (0.35mm thickness steel ); Inside is white color steel (0.35mm thickness steel ). |
Part 5 | Door & window system | |
i. | Door | Material: Steel door Size: 2000*980mm(H*W) |
ii. | Window | Material: Aluminum alloy steel double hollow glass sliding window (including screens) Size:1200*1000mm(H*W) |
Part 6 | Electric system | |
i. | Electric system | Includes ordinary LED light, A-SW double sockets 2set, A-SW air-switch 2 set, Electrical box with safety protection device connecting cable for connecting; |
Part 7 | Accessories | Electric wire; sealant; wiring tube; screws and other accessories. |
How to delivery?
How is your warranty?
12-month warranty for main steel structure, and sandwich panels. Not include the harsh use environment and human damage. If there is a problem, we will suggest you solve it on site and we will bear the relevant cost.
If it cannot be solved on-site, we will arrange to deliver the broken parts to you. Usually, after manufacturing our products, there will be an inspection department to inspect them, and we can provide them to you onlyafter qualified. And during the shipping process, we will buy insurance for the goods.