Fabricated Container Movable House Prefab Camp For Construction site
If the nature of your staff accommodation in the construction site is temporary and just live in the work site for 1-3 years, you can consider our temporary portable accommodation for workers. It will save you a considerable rent, and its construction cost is very low. At the same time, it also solves your accommodation problem for you. On this basis, you can concentrate on your work.
You can choose our container house, steel structure house, and modular house. According to your needs, we will recommend a more suitable house for you to avoid unnecessary consumption.
In addition, the stability of our house is very good, also has wind, earthquake and other functions. The service life of our house is generally 10-15 years. In the process of using, spray some rust paint on the house regularly, and you will use it for a longer time. If you have other questions, you can also leave us a message or send us an email on the website, and our staff will answer them for you in time.
Our advantages
Wall panel System:
we send are 50mm thick rock wool material with heat and thermal insulation, the double plate is 0.4mm thickness, which is enough strong.
Floor system:
There are 4 pcs 2.5mm thickness floor beams, the floor purlin are equipped square tubes with 80*80 and 40*80 two sizes, because we know there are many workers are in. so to make the floor stable, we add the small purlin in 6m directions. Above it, we change the MGO board to an 18mm thickness cement board, it can withstand the longtime harsh environment, such as the toilet and shower room. For the floor leather, we use 1.6mm thickness in the living room, for the toilet and shower room, we will add waterproof felt and aluminum plate on the floorboard to make sure it's waterproof.
Roof system:
For this dormitory in Singapore, except the double-slope roof, our house roof also has waterproof and heat insulation, there is total 4 layer in it, the top tile, the glass wool, roof purlin, and ceiling, beside the roof beam, there are 4 water gutters and downpipes to collect rain.
For the manufacture and delivery, we spend 15 days manufacture and 10 days delivering to Singapore seaport, before the cargo arrives there, all the installation documents are ready and sent to them, finally, the 2 story dormitory installation work is finished in one month. they give the best feedback, we all looking forward to cooperating in the near future.
Assemble Container House | ||
Bottom | Frame structure | 2.3mm thick profiled steel |
Floor | MGO board,waterproof, fireproof (Option Fiber cement) | |
Floor finishes | 1.6mm PVC flooring (extra cost) | |
Roof | Frame structure | 2.3mm thick profiled steel |
Outside cover | 0.5mm steel sheet | |
Insulation | glass wool | |
Ceiling | 0.4mm steel ceiling | |
Corner post | 2.3mm cold rolled steel profile, galvanization (160mm*160mm) | |
Wall panel | Sandwich panel with 50mm rock wool | |
Window | PVC steel sliding windows with dimension 950mm*1200mm | |
Door | Steel door with dimension 950mm*2100mm | |
Electricity | Light, Switch, Socket, distribution box, breaker and wire | |
Painting | Automatic galvanizing and baking paint spray molding | |
Exterior size | 5950(L)*3000(W)*2800(H) |
How to build a container house?
Porject Show
About us
Our company, K-Home, has been engaged in construction site accommodation since it began its business.
We are well appreciated by our fast delivery and good quality and welcomed by both domestic customers and abroad.
Now our business scope has extended to more than 20 countries from north America, Africa and middle east.
This is our pride and driving engine. After all, showing the best experience to customers is our goal.
Please feel free to contact us. Our cellphone and E-Mail are accessible all the day.
We look forward to your message.