PM-19 Full Automatic Under Pad Making Machine Pet Training Pad Production Line
Machine total system:
1. Pulp crusher system
2. SAP feeding system
3. Drum forming system
4. Lower tissue paper feeding system
5. Upper tissue paper feeding system
6. Web roller compacting system
7. Top sheet non woven feeding system
8. PE film feeding system
9. Rotary die system
10. Pull assembly before longitudinal fold
11. Longitudinal fold unit
12. Pull assembly after longitudinal fold
13. Rejection output
14. Out put system
Product Application:
Pet training and puppy pads production line is controlled by triaxial frequency conversion drive +PLC, the product specification can be adjusted arbitrarily, the rectifying device is configured, and the touch screen is used as HMI.
Equipment production process:
Multi-layer toilet paper or dust-free paper can be cut off → water absorption layer → covered with non-woven cloth (with spray glue or thermal bonding) → covered with PE casting film (with spray glue or thermal bonding) → left and right package edge (with streamline glue or thermal bonding) → product folding → product cutting → inspection → factory.
Machine Parameters:
Designed Speed | 250pcs/min |
Stable Production Speed | 180-220pcs/min |
Product Weight Deviation | ±5% |
Passing Rate | ≥97% |
Operating Rate | ≥85% |
Power Supply | 380V 50Hz |
Electrical Supply | 380V ±5%, 50Hz Three-phase four-wire + ground wire |
Power Installed | About 220 KW (Not included hoe melt glue machine) |
Supply Pressure | 0.6-0.8Mpa |
Machine Sizes (L× W× H ) | 28.0m X 7.0m X 3.5m( just for reference) |
Main Engine Sizes (L× W× H ) | 30m×6m×4m ( just for reference) |
Machine Color | Customized |
Packing and Shipping:
All the machines of our company are wrapped in wrapping film and wooden boxes before shipment. They are shipped as standard (except for local company procurement) to check whether the packaging is intact before the customer receives the goods. If there is any damage, please contact our company in time. If it is intact, the customer can safely sign for it. After signing, the wooden box and packaging can be removed by themselves. After the removal, the machine can enter the installation stage.
Our Factory:
FAQ:
1. Your inquiry related to our product&price will be replied within 24hours.
2. Well-trained&experienced staff are to answer all your inquiries in English of course.
3. Working time: 9:00am-6:00pm.
4. Your business relationship with us will be confidential to any third party.
5. Good after-sale service offered,please contact with us if you got question.
6. The warranty period of one year.
7. We are attached to the product installation instructions and video installation,found any questions at any time can reflect to us, we have the professional personnel to deal with your problem.