Scaffoding System Blue Perforated Steel Safety Formwork Screen
Climbing frame formwork screen is often suitable for the construction of complex shapes such as cast-in-situ shear wall, frame, arc balcony and cantilever plate. It is mainly used for high-rise shear wall buildings, which can climb up or down along the building. According to the power source, it can be divided into hydraulic type, electric type, manual type, etc. And floor scaffold building climbing frame mesh.
Compared with the cantilever scaffold, it has the following characteristics:
1. Erect 4-5 floors high at one time, and then climb up one floor with each construction layer of the structure construction.
2. The lifting speed is fast, and the lifting of one floor takes only 30-40 minutes, which can meet the protection needs of one floor in three days for structure construction and two floors in one day for decoration construction.
3. It is more stable. Multiple adhesion and building exterior walls are adopted, and multiple horizontal protection is set, The operator is always within the protection range of the frame body.
4. Compared with the floor frame, it can save 75% of materials and 40% of material costs.
5. The comprehensive cost of the outer frame can be reduced by more than 50%.
Product Name | Outer frame protective screen building peripheral net building safety protective screen |
Product Specification | 1.2X1.8M Frame:20mmX20mmX0.5mm |
Product material | Galvanized plate 0.4mm-0.8mm |
Product color | Green Blue also can be customized |
Product advantage | 1. No need to turn over the shelf 2. Assemble at one time until the construction is completed, saving manpower and materials |