Name:42CrMo4 Alloy Steel Plate
Material:42CrMo4,alloy steel,42CrMo|42CrMo,42CrMo4 steel
Standard:EN10083-3
Thickness:Thickness: 6-80mm, Width: 1360-3000mm, Length: 6000-12000mm
Price:FOB/CIF/CFR
DeliveryTime:15-30 days
PaymentTerms:T/T, 100% Irrevocable at sight
MinimumOrderQuantity:N/A
42CrMo4 Cr-Mo alloy steel plate specifications
1.Appilication:42CrMo4 steel plate are generally intended for fabrication of quenched and tempered, flame or induction hardened machine parts.
2. Referred steel: 25CrMo4, 25CrMoS4, 34CrMo4, 42CrMo4 steel plate-EN10083-3
3. Delivery Condition: AR(As Hot Rolled), N(Normalized), T(Tempered), Q(Quenched), TMCP, Q+T(Quenched and
Tempered), UT(Ultrasonic Test:ASTM A435,ASTM A578-C/B/A,EN10160-S0E1,S1E2,S2E3,S3E4), Impact Test, PWHT(Post
Weld Heat Treatment), HIC, Z Test(Z15, Z25, Z35)
42CrMo4 steel sheet Chemical Composition
Grade | C | Si | Mn | P | S | Cr | Mo |
42CrMo4 | 0.38-0.45 | ≤0.40 | 0.60-0.90 | ≤0.035 | ≤0.035 | 0.90-1.20 | 0.15-0.30 |
42CrMo4 Cr-Mo alloy steel plate Mechanical Property
42CrMo4 | Yield Strength Re/MPa-(Min) | Tensile Strength Rm/M-Pa | Elongation A/% (Min) | Reduction of arean Z/%(Min) | KV/J(Min) |
≤8mm | 900 | 1100-1300 | 10 | 40 | 30 |
8mm<t≤20mm | 750 | 1000-1200 | 11 | 45 | 35 |
20<t≤60mm | 650 | 900-1100 | 12 | 50 | 35 |
60<t≤100mm | 550 | 800-950 | 13 | 50 | 35 |
100<t≤160mm | 500 | 750-900 | 14 | 55 | 35 |
Steel products delivery guarantee:
1. According to the standard of container shipment.
2. Steel packaging is moistureproof and abrasionproof.
3. The ship is low safety risk, arrives quickly, and delivery in time.
1.DO you have factory?
We act as main distributors of goverment owned mills, and we have our own machining centers for cutting and simple machining jobs.
2.Where is your factory?
Our representative mills located in Henan, Shangdong, Jiangxi, Guangdong provinces,etc.
3.Can you send us the sample?
It should be according to our stock status and samples are available when we have suitable stocks.
4.How about the delivery time?
Normally we can keep 40 days in average with mill run schedule, for stocks within 10 days. All delivery terms are on basis to Chinese loading port.
5.What payment terms can you accept?
T/T or L/C. For special requests about the payment, please indicate us first then we will check the availability.
7, What is your MOQ?
MOQ for mill run should meet 5tons per size in normal condtions, which should follow the schedules of our mills when inquiry time.
8, What is your shipping port?
Tianjin, Shanghai, Qingdao, etc. All loading ports in China are ok for us.
9,Could i visit the factory by myself?
Surely you can, please inform us your plan in advance so we can arrange some people to take you have a look around our mills/ factories.
10.Can you give me the Manufactory Test Certificate?
For sure we can supply some samples for your reference.
Related Products