Metal Lecture Hall Seating / Musical Hall Seats / Stacking Church Chairs with Book Net
Description:
1. Seat and back cover: made of good quality plywood with special painting in black color, very elegant.
2. Seat cushion and backrest cushion are made of molded PU(polyurethane) foam upholstery with fabric or PU leather(artificial leather).
3. Fold-up seat,Tip-up seat.
4. Fixed chair back
5. Plastic or wolidwood armrest with folded writing tablet. The tablet is made of MDF material or PP material.
6. chair base/leg is made of cold-rolled steel tube with powder coating.
7. PU foam density: 55-65kg/m3.
8.chair fabric and foam can be made fire proof/retardant.
9.international standard: European UK starndad BS5852,BS7176. USA standard CA117,TB117. Chinese standard GB.
10. optional seat number and row number.
11. we have 5-year warranty for our cinema chair,cinema seat and cinema seating.
Package and Payment Information
Payment: | By T/T;30% of total value should be paid before producing, balance should be paid before loading container. |
Delivery time: | 20-25days for the quantity of 40’HQ after the deposit received. |
Package: | 1.Knocked-down packing, Plastic inside, 5 layer brown paper carton. 2. 0.125cbm/pcs 3. 220pcs/ 20'GP container, 540pcs/40'HQ container |
Warranty: | 5 years. |
Service: | 1. OEM/ODM service are available 2. Customzied models are welcomed if chair pictures or specification is provided 3. Small order is welcomed. Exw, FOB, CIF, C&F trade terms are welcomed 4. VAT invoice is vailable. 5. Professional CAD design team 6. Installation description is available 7. Intergrate the goods from other |
FAQ
1. Customize design & dimention
we have our own factory , so customize design & size order are welcomed ,
but the delivery time would depend on our production schedule
2. Lead time
15 – 20 days during factory busy period ( June , July )
18 – 25 days during factory off period ( except for June , July )
3. QC & Inspection
High resolution photos would be forwarded to you during and after the production
4. Installation
Detailed installation guide would be supplied after production . if still have problem with the guide , simple installation video on youtube.com , so do not need to worry about the installation problem