Manufacturing, Installation and Manufacturing Planning of Equipment
1) After signing the contract:
A. Drawing countersign: After the contract comes into effect, we begin to design detailed drawings. After the design is completed, we notify buyer in writing or by email for drawing countersign. After confirmation, we can put it into production.
Drawings will be signed within 15 days after the contract takes effect.
Drawing countersign personnel: principal agents, technicians, users, senior managers and relevant responsible persons of both parties.
The drawings of the meeting label include: complete drawings of equipment layout, outline and dimension drawings of single equipment, appearance and color of equipment, equipment foundation, ground bearing capacity and laboratory configuration.
B. Buyer starts to plan the location of factory and foundation construction according to the foundation drawing.
C. We shall actively cooperate with buyer and guide the construction of the foundation.
D. If there are any doubts in the process of product manufacturing and production, the two sides will hold another meeting to discuss.
2) Equipment Manufacturing
A. After the drawings will be signed, we will put into full production and manufacture, and complete the equipment manufacturing process under the condition of guaranteed quality.
B. Guarantee the completion of design, manufacture, installation, commissioning and delivery within the project cycle.
C. Manufacturing schedule:
JoB |
NO. |
Proces |
Working days |
---|---|---|---|
PREPARE |
|
Establishes a project team after signing the contract | 15 days |
|
Technical personnel communicate with users for the first time to reach consensus on equipment scheme | ||
|
Make production catalogue | ||
|
Start design drawing | ||
|
Time Planning for Machine Addition and Installation Personnel | ||
PRODUCING |
|
Make drawings, conduct technical meetings to review drawings, confirm that there are no errors and list production plan with information. | 50 days |
|
Inventory of spare parts, no inventory to start purchasing all purchased spare parts | ||
|
Raw materials for cutting | ||
|
Starting Machining of Parts | ||
|
Body start welding | ||
|
Body grinding and weld inspection | ||
|
Conduct welding inspection | ||
|
Removal of stress and post-processing machine body | ||
|
Inspection Processing Parts and Outsourcing Parts | ||
|
Antirust Primer for body Spraying | ||
1stCOMMISSING |
|
Prepare tools to start assembling the fuselage | 20 days |
|
Hydraulic and electrical systems begin to assemble | ||
|
Piping | ||
|
Cleaning residue | ||
|
Assembling Mold(if have) | ||
|
After cleaning the oil tank, refueling and power debugging | ||
|
Adjustment of parameters such as ex-factory pressure and body parallelism | ||
|
Commissioning to qualified parameters | ||
DISPATCH |
|
Remove parts and accessories for painting | 5 days |
|
Check whether the fittings are worn or not | ||
|
Re-assembly of dismantled parts | ||
|
Factory inspection | ||
|
Notify the buyer machine is ready and make shipping plan | ||
|
Installers prepare for installation | ||
|
Handover of installation plan between installation technicians and users | ||
|
Container loading | ||
|
Send to port |
3) Door to door Installation is available but a payable service, buyer should contact sales to arrange it before machine finished.