Garde | Si | Fe | Cu | Mn | Mg | Cr | Zn | Ti | Al |
1050 | 0.25 | 0.4 | 0.05 | 0.05 | 0.05 | — | 0.05 | 0.03 | 99.5 |
1060 | 0.25 | 0.35 | 0.04 | 0.05 | 0.03 | — | 0.04 | 0.03 | 99.7 |
1100 | Si + Fe ≤ 1.0 | 0.05-0.20 | 0.05 | — | — | 0.1 | — | 99 | |
2024 | 0.5 | 0.5 | 3.8-4.9 | 0.30-0.9 | 1.2-1.8 | 0.1 | 0.25 | 0.15 | Rem. |
3003 | 0.6 | 0.7 | 0.05-0.20 | 1.0-1.5 | — | — | 0.1 | — | Rem. |
3004 | 0.3 | 0.7 | 0.25 | 1.0-1.5 | 0.8-1.3 | — | 0.25 | — | Rem. |
3005 | 0.6 | 0.7 | 0.3 | 1.0-1.5 | 0.2-0.6 | 0.1 | 0.25 | 0.1 | Rem. |
5005 | 0.3 | 0.7 | 0.2 | 0.2 | 0.5-1.1 | 0.1 | 0.25 | — | Rem. |
5052 | 0.25 | 0.4 | 0.1 | 0.1 | 2.2-2.8 | 0.15-0.35 | 0.1 | — | Rem. |
5083 | 0.4 | 0.4 | 0.1 | 0.4-1.0 | 4.0-4.9 | 0.05-0.25 | 0.25 | 0.15 | Rem. |
6061 | 0.4-0.8 | 0.7 | 0.15-0.40 | 0.15 | 0.8-1.2 | 0.04-0.35 | 0.25 | 0.15 | Rem. |
7075 | 0.4 | 0.5 | 1.2-2.0 | 0.3 | 2.1-2.9 | 0.18-0.28 | 5.1-6.1 | 0.2 | Rem. |
Product Details:
Processing:
Other product:
FAQ:
1) What is the delivery time?
depends actual order, around 5 to 15 days
2)What is the QC system:
We have QC staff of 5 persons and advanced equipment, each production is with MTC traced from Aluminum ingot lot.According to the standard we will inspect every producing step.
3) How many tons one 20GP or 40GP could load?
One 20GP could load about 20tons, And 40GP load about 24tons.
It depends on the different specification.