Our Dynamo Series machines are featured with close loop controlled fly shear and fast punching machine, can continuously run a product with accuracy and speed. The leveler& loop control are generally inclusive to ensure feeding and punching speed and accuracy.
This door frame forming machine is the roll forming machine for steel sheet cold-form industries. It continuously forms the steel sheet according to customer’s requirement with automatic press and fly cut to length.
Machine has high forming speed, low noise, stable transmission and easy operation.
NO | Item | Parameters | Remark | |
1
|
Suitable material | Type | Cold Roll | |
Thickness (mm) | 0.8-1.2mm | |||
Grade | 235Mpa | |||
Coil Width (mm) | 247mm | |||
2 | Producing Speed (m/min) | Variable18-25m/min | Including cutting&punching time | |
3 | Rollformer Main Motor Power(KW) | 11Kw | For reference only | |
4 | Hydraulic station power for punching and cutting (KW) | 22Kw | For reference only | |
5 | Leveling motor power(KW) | 3kw | For reference only | |
6 | Decoiler hydraulic power(KW) | 2Kw | For reference only | |
7 | Servo feeding motor power(KW) | 2.2 kw | For reference only | |
8 | Servo flying shear motor power | 2.2 kw | For reference only | |
9 | Hydraulic cutting power(KW) | 11kw | For reference only | |
10 | Total power | About 53kw 380V 50HZ 3phase |
power source according to client’s final confirmation |
Name | Model/Name | Quantity |
1 | 5 Ton Hydraulic Un-coiler | 1 set |
2. | Leveling device | 1 set |
3 | Loop unit | 2 sets |
4 | Feeder | 1 set |
5 | Punching equipment | 1 set |
6 | Roll Forming equipment | 1 set |
7 | Post-cutting device | 1 set |
8 | Rack | 1 set |
9 | Hydraulic system | 2 sets |
10 | Electrical system |
1 set |
De-coiling →Leveling →Guiding system → Punching → Straitening →Roll forming → Cut to length → Run Out Table
Item Name: | Door frame roll forming machine |
Material: | Cold Roll or GI |
Line Speed | Up to 25m/min |
Material Coil width | Per the design of product |
Power | 380V 3phase or Per the client's request |
Gram Weight: | Around 15 tons |
Delivery time: | 90~120days |
MOQ: | 1 Set |
Delivery | FCL |
Warranty | 1 year |
The seller take responsibility to installation and commissioning of the equipment and free training. After machine arrive the destination, by the request of the buyer , the seller will provide 1 technical engineer to guide installation and training , and the buyer should give the technical person with full cooperated.
Installation period: about 5 days after the complete preparation by the buyer such as the foundation and all necessary accessories.
Training time: 5 days.
Before departure of the engineers from seller, the buyer should pay for installation and commissioning fee 100$/day to the point account of the seller. The two-way ticket,visa, food, hotel , the translator and insurance are all should provide by buyer with full responsibility.
The seller supply technical data (including forming mould drawing, electrical elements drawing and equipment drawing etc.)