Drawing for you reference:
Suitable material | Steel with 1.2-1.5mm |
Main roller station | 18 groups |
Straighting rollers | 5 groups |
Motor power | 7.5KW |
Reduce type | 250# |
Shaft diameter | Φ70mm |
Shaft material | 45# forging Steel |
Roller material | GCr15 |
Roller treatment | Vacuum hardening & Polished |
Galvanization | 0.05mm |
Processing speed | 8-12m/min |
Chain size | 1.2inch |
PLC Brand | SIEMENS |
Frequency Changer | SANJING |
Electrical element | Schneider |
Touch screen | Touch-win |
Fuse protector | Schneider |
Control transformer | Schneider |
Voltage standard | 380V50Hz |
Hydraulic Pump Station | 1 SET |
Pump Motor Power | 5.5KW |
Cutting mold material | Cr12 |
Length Cutting Tolerance | +/-1.5mm |
The seller take responsibility to installation and commissioning of the equipment and free training. After machine arrive the destination, by the request of the buyer , the seller will provide 1 technical engineer to guide installation and training , and the buyer should give the technical person with full cooperated.
Installation period: about 5 days after the complete preparation by the buyer such as the foundation and all necessary accessories.
Training time: 5 days.
Before departure of the engineers from seller, the buyer should pay for installation and commissioning fee 100$/day to the point account of the seller. The two-way ticket,visa, food, hotel , the translator and insurance are all should provide by buyer with full responsibility.
The seller supply technical data (including forming mould drawing, electrical elements drawing and equipment drawing etc.)