Gutter roll forming machine
Profile drawing
Technological process:
Uncoiler—Feeding—Roll forming—Hydraulic cutting —Output table
Technical Data
Items | Specifications | |
Material of coil | Material | Aluminum |
Material Thickness | 0.3-0.8mm | |
Manual Uncoiler | 3 tons | |
Forming system | Rolling Speed | 10-15m/min |
Roller Stations | 16 stations | |
Shaft Diameter | 56mm | |
Roller Material | 45#steel 0.03-0.05mm chromed | |
Shaft Material | 45#steel | |
Main Motor Power | 5.5kw | |
Frame | Wall plate | |
Transmission | Chain | |
Hydraulic system | Hydraulic Power | 3kw |
Blade Material | Cr12Mov | |
Tolerance | +-1.5mm | |
Electrical control system | Electric Source | 380V, 50HZ,3 phase(customized) |
PLC Control System | Panasonic | |
Encoder | Omron |
Main Items
No. | Name | Qty |
1 | Manual Uncoiler | 1 |
2 | Main Roll Forming Machine | 1 |
3 | Cutting Device | 1 |
4 | PLC Control Box | 1 |
5 | Hydraulic Pump Station | 1 |
6 | Output Table | 2 |
Customer visit
Packing case
FAQ
1. Q: What's the warranty period? (24hours online)
12 months warranty period, starting from the date of the successful installation and commissioning of the equipment at the Buyer’s Installation site. During which all parts damaged because of quality problem will be changed for free.
2. Q: Do you have installation and commissioning service?
A.If buyers come to our factory to inspect, the training to install and operate is provided face to face. If not, manual and video is provided to show how to install and operate.
B. If buyer need we will send technician to buyer site to do installation and commissioning and training.
C.installation and commissioning cost: One engineer will visit Buyer’s workshop for installing, commission and training. The buyer has to pay USD100/per day and visa fee, air tickets fee, accommodation and food, necessary communication, etc.
(Normally ,It takes about a week to install )
3. Q: What’s your after-sales service ?
We provide 24-hour online service for our customers.
And we are happy to give advice and also have skilled technicians available to maintain the machine overseas to customers’ workshop if needed.
4. Q: What's your delivery time ?
Normally we can finish production and testing within 45-70 days after receiving deposit. Some machines in stock, can be delivered at any time
5. Q: You are trading company or factory?
We are Manufacturer, and we export our machine by ourselves.
6. Q: Do you provide customized machine?
Sure, we can design the machine according to the requirement and profile drawing you provide. Our engineers can offer the best professional solution to our worldwide clients.
7. Q: How to place order ?
Inquiry---confirm the profile drawings and technical specification and price----confirm the PI---arrange the deposit or L/C---start production-- do inspection--- Shipment
8.What are your terms of payment ?
First payment: 30 % by T/T, second payment: 70% by T/T, after the successful inspection at seller’s workshop, and before delivery.