Recyclable Kids Women Men Boot Making Machine 12 Stations With Mold Air - Blowing Device
Gumboots production line.jpg.pdf
What we can supply for you?
1. The whole production line for making shoes, including machine, mold, material;
2. The advice on Factory building, factory management, production & package for shoes, layout;
3. The service of machine oepration and shoes production;
4. The in-time after-sales service;
5. The turn table may run reversibly in case of emergency to eliminate the abnormality and upkeep the safety operation.
Characteristic | |||
Machine model | JL-288 | JL-288-2C | |
Mould-clamping Unit | |||
Work station | 12,16 | 12,16 | |
Clamping force | TON | 220 | 220 |
Opening stroke | MM | 210 | 350 |
Mould dimension | MM | 420x320 | 650*260 |
Height of injection nozzle | MM | 280 | 650 |
Injection Unit | |||
Injector | SET | 1 | 2 |
Screw diameter | MM | 90/95 | 95/90,85/80 |
Screw L/D ratio | L/D | 19 | 19 |
Max.injection volume | cm3 | 1500-1700 | 1500-1700,800-950 |
Injection speed | Cm/s | 520 | 520 |
Screw rotation speed | R.P.M | 0-200 | 0-200 |
Electricity Consumption | |||
Heating power of injector | KW | 7 | 7*2 |
Hydraulic unit motor | KW | 22.5 | 22.5,18.5 |
Total electric consumption | KW | 29.5 | 55 |
Temperature control | Section | 4 | 4*2 |
Dimension and Weight | |||
Machine dimension | (L*W*H)MM | 5100*4900*2550 | 7600*4900*2550 |
Machine weight | KGS | 11000 | 18000 |
*Note:Above data only for reference. |
Production Process
Below is the process for produce full shoes, easy operate.
It need 1-3 people for the full process.
Payment Terms
1. Negotiated, 30% T/T down payment , balance shall be paid before shipment.
2. T/T, Westem Union, PayPal, Escow, MoneyGram.
Machine Production Time
25-45 days after confirm deposit.
Packing
Professional export package, plastic film packing, or Wooden case packing.
Shipping
By Sea, One Container for one machine
Delivery Terms
As per request: EXW, FOB, CIF for your option;
Guarantee
2 years. We provide 2 years guarantee time for all of our machine, it’s the longest time in China.