PVC PCU Material Slipper Making Machine For Children's Cartoon Shoe Slipper Sandal Sole JL-108
PVC slippers production line.jpg.pdf
What is the application of our machine?
Why Choose us?
Our 5S management principle.
1. To share our 30 years experiences with our respected customer.
2. To supply whole production line for making shoes (Include Machine, Mould, Material).
3. To support our customer on Factory Building, Factory Management, Production & Package for Shoes, Sales Layout, Market Development.
4. To service customer with machine operation and maintenance.
5. To solve the problem quickly and efficiently on the after sales service.
Features:
1. By computer, Electrical box, PLC control---more simple, fast and precision.
2. It could be equipped with air blowing system. --- can produce light weight, particularly the need for reinforced cooling effect.
3. Computerization in analysis and design---the machine is well in stability.
4. Conformed to human engineering in design---it features operational compatibility.
5. It could be equipped with servo system. --- can save 30~40% electricity.
6. It could be equipped with cooling system. --- can cooling the mould and extend the mould life.
7. The well-interconnected oil circuit by electric control --- can reduce waiting time, quicken production rate, and promote productivity.
Specifications | |||
Machine model | JL-108 | ||
Mould-clamping Unit | |||
Work station | 12,16,20,24,30 | ||
Clamping force | TON | 80 | |
Opening stroke | MM | 210 | |
Mould dimension | MM | 600*280 | |
Height of injection nozzle | MM | 280 | |
Injection Unit | |||
Injector | SET | 1 | |
Screw diameter | MM | 60/65/70 | |
Screw L/D ratio | L/D | 20 | |
Max.injection volume | cm3 | 650-1000 | |
Injection speed | Cm/s | 10 | |
Screw rotation speed | R.P.M | 0-200 | |
Electricity Consumption | Normal | Servo | |
Heating power of injector | KW | 7 | 7 |
Hydraulic unit motor | KW | 18.5 | 15.7+7.5 |
Total power | KW | 25.5 | 30.2 |
Temperature control | Section | 4 | 4 |
Power consumption per hour | Kw/h | 15-20 | 7-10 |
Dimension and Weight | 24 Stations | ||
Machine dimension | (L*W*H)MM | 4600*3600*2300 | |
Machine weight | KGS | 6000 | |
*Note:Above data only for reference. |
Payment Terms
1. Negotiated, 30% T/T down payment , balance shall be paid before shipment.
2. T/T, Westem Union, PayPal, Escow, MoneyGram.
Machine Production Time
25-45 days after confirm deposit.
Packing
Professional export package, plastic film packing, or Wooden case packing.
Shipping
By Sea, One Container for one machine
Production Process
Below is the process for produce full shoes, easy operate.
It need 1-3 people for the full process.
After-sales Service
1 We will send technicians to buyer's factory for installation and training for 5-10days;
2 Our technicians will help you to install machine and works machine;
3 After the machine works well, our technicians will teach your workers how to produce shoes, and how to solve some emergency conditions.
4 After your workers can produce shoes very skilled, then our technicians back.
5 Also you can send your technicians to our factory for training.
6 Any questions can contact us, we will reply you within 24 hours.
Welcome to Kingstone Machinery!