Women Men Lesiure Shoes PVC Sole Making Machine with 12 16 20 24 Stations JL-105
Auxiliary Equipment:
Dry Machine + Color Mixer + Air Compressor + Cooling Water Tower + Plastic Crusher
Features:
1. Material:Suitable for all kinds of thermoplastic raw materials, foaming or non-foaming, such as PVC and TPR.
2. Product:Specialized in producing various kinds of one color outsoles for sport shoes, leisure shoes, slippers, sandals, man’s and lady’s shoes in general, etc.
3. Computerization in analysis and design, the machine is well in stability.
4. Conformed to human engineering in design, it features operational compatibility.
Specifications | |||
Machine model | JL-105 | ||
Mould-clamping Unit | |||
Work station | 12/16/18/20/24/30 | ||
Clamping force | TON | 80/120 | |
Opening stroke | MM | 210 | |
Mould dimension | MM | 600*280 | |
Height of injection nozzle | MM | 280 | |
Injection Unit | |||
Injector | SET | 1 | |
Screw diameter | MM | 55/60/65/70 | |
Screw L/D ratio | L/D | 20 | |
Max.injection volume | cm3 | 500-1000 | |
Injection speed | Cm/s | 10 | |
Screw rotation speed | R.P.M | 0-200 | |
Electricity Consumption | Normal | Servo | |
Heating power of injector | KW | 7 | 7 |
Hydraulic unit motor | KW | 18.5 | 15.7+7.5 |
Total power | KW | 25.5 | 30.2 |
Temperature control | Section | 4 | 4 |
Power consumption per hour | Kw/h | 15-20 | 8-12 |
Dimension and Weight | 24 Stations | ||
Machine dimension | (L*W*H)MM | 4600*3600*2300 | |
Machine weight | KGS | 6000 | |
*Note:Above data only for reference. |
Below is the auxiliary machine for the full production line:
1. Dry mixer: it use to drying the moisture of material.
2. Color mixer: it use to mix other color with material, so you can make different colors of shoes.
3. Plastic crusher: it can crush the defective goods, to recycle and reuse.
4. Cooling water tower: it use to connect the machine and cool the machine and mould.
5. Air compressor: it use to connect the machine and provide air in the production.
Payment Terms
1. Negotiated, 30% T/T down payment , balance shall be paid before shipment.
2. T/T, Westem Union, PayPal, Escow, MoneyGram.
Machine Production Time
25-45 days after confirm deposit.
Guarantee
2 years. We provide 2 years guarantee time for all of our machine, it’s the longest time in China.
After-sales Service
1. We will send technicians to buyer's factory for installation and training for 5-10days;
2. Our technicians will help you to install machine and works machine;
3. After the machine works well, our technicians will teach your workers how to produce shoes, and how to solve some emergency conditions.
4. After your workers can produce shoes very skilled, then our technicians back.
5. Also you can send your technicians to our factory for training.
6. Any questions can contact us, we will reply you within 24 hours.