Polyurethane PU Injection Shoe Machine / PU Sole Injection Machine / PU Foam Machine
JL-298
Details of PU foam machine :
1. This machine can make 4 color,3 density PU shoe sole and other PU products.
2. Magnetic coupling coupler with high tech permanent magnetic control.
3. no temperature rise and no leakage.
4. Mixing head adopts double proximity switch control interlock function.
5. Raw material timing cycle function ensures no crystallization during downtime.
6. Electric heating system makes the heating faster and better.
PU shoes samples maked by our machine:
Professional specifications of our machine:
Specifications of Machine | |||
Machine model | JL-298 | ||
Tank quantity | 3 | ||
Tank capacity | L | 120/160/250 | |
Metering pump quantity | 3 | ||
Metering pump speed | rpm | 0-280 | |
Rotating speed of pouring nozzle | rpm | 8600 | |
Cleaing of pouring nozzle | Manual/Auto | ||
Measure precision | ±0.5 | ||
Max.pouring volume | G/S | 90 | |
Rated voltage | V | 3 phase 220/380 | |
Power | KW | 23 | |
Specifications of Moulding Conveyor | |||
Work stations | Stations | 60/80/100 | |
Speed adjustment range of mould table | M/min | 0-20 | |
Mould table dimension | mm | 600*500/500*500 | |
Metering pump speed | rpm | 0-280 | |
Rotating speed of pouring nozzle | rpm | 8600 | |
Heating Mode | Electricity/oil | ||
Power | KW | Electricity 36/49.5/61.5 Oil heating 4/5.5/5.5 | |
Dimension | MM | 19000/25000/30000*2000*1500 | |
*Note: Above data only for reference. |
Our Advantages:
1. To share our 30 years experiences with our respected customer.
2. To supply whole production line for making shoes (Include Machine, Mould, Material).
3. To support our customer on Factory Building, Factory Management, Production & Package for Shoes, Sales Layout, Market Development.
4. To service customer with machine operation and maintenance.
5. To solve the problem quickly and efficiently on the after sales service.
Payment Terms
1. Negotiated, 30% T/T down payment , balance shall be paid before shipment.
2. T/T, Westem Union, PayPal, Escow, MoneyGram.
Machine Production Time
25-45 days after confirm deposit.
Packing
Professional export package, plastic film packing, or Wooden case packing.
Shipping
By Sea, One Container for one machine
Delivery Terms
As per request: EXW, FOB, CIF for your option;
Guarantee
2 years. We provide 2 years guarantee time for all of our machine, it’s the longest time in China.
Machine Details:
FAQ
1. Are you manufacturer?
Yes, we are manufacturer for shoe making machine and shoe mold. Welcome to visit our factory!
Address: Huarui Industrial Park, Hengjiang Village, Chashan Town, Dongguan City, Guangdong P.R.C
2. What do you think of the quality of your machine?
The boss start machine business many years, so he know the quality for machine is very important. From Kingstone Machinery Beginning, we stressed the high quality of machine to win a good reputation.
We are confident with our machine.
3. What's the price of your machine?
The price of our machine is not lowest, but competitive. We stress the machine quality, so the spare parts of our machine is made from international brand. With it, we keep high quality and competitive price.
4. Can you provide the machine detailed information and video?
Yes, we can provide the detailed information of machine and video to you if you want it.
5. Can we see the machine working while I come your factory?
Yes.
6. What do you think the different between your machine with other machines?
That's a good question.
First, the spare parts is different. Ours is made from international brand, others is made from domestic factory. The function has a big different. That is why other machines can provide lower price.
Second, the conformation of the machine. According to the height of people, we adjust the height of the machine, now it's convenient to put the mold and take the shoes from the mold for everyone.
Third, the performance of the machine. Previous machine will waste some materials in the working process. Now we make changes and reduce this kind of waste. It will help our customers to reduce the cost.
.....
7. How about the delivery time?
The delivery time is about 30-45 days. Because we need arrange production line, and after finished, we need test the machine some days. If you are urgently, we can try our best to arrange the production.
8. Will your company will send the technical workers to my factory?
Yes, we will send our technical workers to your factory and install the machine and teach your workers how to operate the machine. But your factory need arrange the living and food.