Automatic Vertical 2 Stations Rubber TPU /TR/PVC Shoe Sole Injection Machine
2 Stations Rubber TPU /TR/PVC Shoe Sole Injection Machine Features:
1. Every station is with two-side operation;
2. Hydraulic system control at each station is separate.
3. Every station is with special insulation design to prevent heat loss, save energy, and comforts work environment.
4. Control of mold sliding device is separate;
5. One operator can handle multi stations to save labor cost.
2 Stations Rubber TPU /TR/PVC Shoe Sole Injection Machine Production Time
25-45 days after confirm deposit.
Payment Terms
1. Negotiated, 30% T/T down payment , balance shall be paid before shipment.
2. T/T, Westem Union, PayPal, Escow, MoneyGram.
2 Stations Rubber TPU /TR/PVC Shoe Sole Injection Machine details:
More details welcome to visit our factory! We has the machine in factory for your checking !
Guarantee
2 years. We provide 2 years guarantee time for all of our machine, it’s the longest time in China.
After-sales Service
1. We will send our professional engineer to your factory for machine installation;
2. Our technicians will teach your workers to work machine and make shoes;
3. We will provide some new design for you;
4. We will give you quick reply for some questions.
2 Stations Rubber TPU /TR/PVC Shoe Sole Injection Machine Specifications | ||
Machine model | JL-208 | |
Mould-clamping Unit | ||
Work station | 2 | |
Total clamping force | TON | 150 |
Mould-holder dimensions | MM | 450*500 |
Mould space | MM | 180 |
Electricity Consumption | ||
Heating mode | Steam,Conduction oil, Electric Heating | |
Hydraulic unit motor | KW | 15 |
Dimension and Weight | ||
Machine dimension | (L*W*H)MM | 7800x3100x2500(mm) |
Machine weight | KGS | 14000 |
*Note:Above data only for reference. |
Factory Address:
Huarui Industrial Park, Hengjiang Village, Chashan Town, Dongguan city, Guangdong , China.
(Nearest airport: Guangzhou Baiyun Airport. Route: 1. Take bus from airport to Dongguan Dongcheng Terminal, about one hour to arrive. 2. Take subway to Guangzhou East Station, take train to Dongguan Station, about one and half hour to arrive.)
Samples
The finished products TPU.TR.TPR.PVC OUTSOLES .