PVC DIP Injection Moulding Machine With Upper for Canvas Shoes
JL-258-2C
DIP canvas shoe sole production line.jpg.pdf
Applications of our machine:
It is the best machine to make canvas shoes and sports shoes.
The canvas shoes produced by our machine don't sewing and attached with glue.
Features:
1. This machine can use PVC TPR as raw material to make canvas shoes.
2. With computer timing and full proportional pressure control system.
3. Our machine adopts the injection volume according to the requirements of mould on the station.
4. High plastifying capacity,the temperature can be controlled automatically by pre-selection.
5. The sequence of mould-closing and shoe last-pressing can be choosed.
Detailed specifications of our machine:
Specifications | ||
Machine model | Unit | JL-258-2C |
Mould-clamping Unit | ||
Raw material | PVC/TPR | |
Work stations | 12/16/20/24 | |
Shoe last trip | MM | 60 |
Shoe last height | MM | 210-260 |
Mould dimension | MM | 340×180×60 |
Clamping mould style | V | |
Injection Unit | ||
Screw diameter | MM | 75,60 |
Screw L/D ratio | L/D | 20 |
Max.injection volume | cm3 | 750,600 |
Rotary table pressure | Mpa | 3.0 |
Plasticizing capacity | g/s | 40 |
Injection pressure | Mpa | 5.0 |
Screw rotation speed | R.P.M | 0-200 |
Electricity Consumption | ||
Heating power of injector | KW | 9,8 |
Hydraulic unit motor | KW | 15,11 |
Total electric consumption | KW | 43 |
Dimension and Weight | 20 Stations | |
Machine dimension | (L*W*H)MM | 7450×6150×2000 |
Machine weight | KGS | 12500 |
*Note:Above data only for reference. |
Payment Terms:
1. Negotiated, 30% T/T down payment , balance shall be paid before shipment.
2. T/T, Westem Union, PayPal, Escow, MoneyGram.
Machine Production Time:
25-45 days after confirm deposit.
Delivery:
This machine need one 40HQ container, professional package and loading for this machine, to make sure it can arrived your factory safety.
Guarantee
2 years. We provide 2 years guarantee time for all of our machine, it’s the longest time in China.
After-sales Service
1. We will send technicians to buyer's factory for installation and training for 5-10days;
2. Our technicians will help you to install machine and works machine;
3. After the machine works well, our technicians will teach your workers how to produce shoes, and how to solve some emergency conditions.
4. After your workers can produce shoes very skilled, then our technicians back.
5. Also you can send your technicians to our factory for training.
6. Any questions can contact us, we will reply you within 24 hours.