C Series -- Showtechled Outdoor Waterproof Transparent LED Mesh Screen High Brightness Energy Saving LED Screen
(1) Description of Outdoor Waterproof Transparent LED Mesh Energy Saving LED Screen:
(2) Quick Detail:
● Pixel Pitch: 15.625*31.25mm(H*V)
● Transparency: 50%
● Brightness: 12000cd/㎡
● Avg Power Consumption: 100W/㎡
● Refresh rate: 3840Hz
● Maintenance type: Front / Back Maintenance
(3) Specifications:
Module Parameter | ||
1 | Item | C1531 |
2 | Pixel Pitch | 15.6x31.25mm(H*V) |
3 | Pixel density | 2048dots/㎡ |
4 | LED configuration | DIP349 |
5 | Module size | 500(W)×250(H)×25(D)mm |
6 | Module resolution | 32(W)x8(H) |
7 | Scanning Mode | Static |
Cabinet Parameter | ||
1 | Cabinet resolution | 64(W)x32(H) |
2 | Cabinet size | 1000(W)×1000(H)×85(D)mm |
3 | Cabinet weight | 19.5kg |
4 | Cabinet marerial | Aluminum |
5 | Transparency Rate | 50% |
6 | Brightness | 12000cd/㎡ |
7 | Viewing angle | 120°(horz.), 60° (vert.) |
8 | Optimal View Distance | 15m |
9 | Gray scale | 14(bit) |
10 | Max Power Consumption | 360W/㎡ |
11 | Avg Power Consumption | 100W/㎡ |
12 | Work Voltage | AV190-260V |
13 | Frame Frequency | 60Hz |
14 | Refresh rate | 3840Hz |
15 | Operation System | Win7&XP |
16 | Control Mode | Synchronization with PC |
17 | Operating Temperature | ( -40℃~+50℃ ) |
18 | IP Rating(Front/Rear) | IP65/IP65 |
19 | Installation / maintenance type | Front / Back installation Front / Back maintenance |
20 | Life Span | 100,000Hours |
Notices:
1. Be sure to connect the wires correctly, do not connect the wrong wires.
2. Do not expose the copper wire outside the power terminal hole to avoid short circuit or electric shock.
3. During the rainy season, the LED screen display is guaranteed to be used at least once a week, and it is lit for at least 2 hours each time.
4. The use of outdoor LED displays is complex, and it is inevitable that there will be water seepage in the cabinet. Usually, it is necessary to regularly check whether the waterproof rubber ring of the cabinet is aging, deformed or incomplete; whether the screws or locks of the sealing box are easy to loosen and the pressure is not enough, which affects the use.
Application:
Widely used for outdoor squares, stadiums, hotels, hospitals, schools, shopping malls, supermarkets, etc.
FAQ:
Q1. Can you assign engineer to our site to guide the installation if we require?
A: Yes.We have qualified and experienced engineers who are ready to service for you.
Q2. How about your warranty and after-sale policy? Two years warranty,or longer if required.
A: We provide 24 hour phone answering service and real-time remote control service if you have any problem with our LED screen.
Q3. How long time I can get the cargo after placing the order?
A: Our production time is about 15~30 working days.
When we confirmed the order after we get your deposit we can start production we will update the production details in time:Before finish.we will notice you and after we get full payment we can delivery the goods to you.
About the time from start port to destination that depends on the distance and the state of the sea company or air port company.
Q4. What's the difference of DIP(1R1G1B)and DIP(3 in1)?
A: DIP(One LED 3 in 1)LFD Display one pixel has one FD lamp 3 led chins in one LED lamp Traditional DIP (1R1G1B) use 3 LED Lamp in one pixel.
Q5. How I can make payment?
A: Dear customer if you're interested in our products and want to make order with us please send us an inquiry.our staff will contact you within 3 hours in working time We support T/T.West Union. L/C.etc.
And about payment we need you pay us 30% as deposit for the rest part before delivery.