SINO YSV 1160 High Precision 3 Axis Cnc Automatic Milling Type Cnc Lathe For Metal Cutting
Machine Center with Outstanding Performance
1. Taiwan's frequency converter tool magazine has significantly sped up processing by reducing the time it takes to change tools to just 1.4 seconds;
2. High torque generation is often produced by all three axes, allowing for rapid and precise placement.
3. A typical 11–15 KW high-torque generic motor drives the spindle motor. This spindle torque is far higher than that of comparable models, making it perfect for heavy cutting.
The circumstances under which machines operate
1. A three-phase, 50Hz, 10%, 15%, and 1Hz alternating current power supply operating at 380V.
2. The temperature outside is 840°C.
3. A relative humidity of 80%
4. An air supply pressure of 0.6 to 0.8 MPA
Product image /photos:
Installation, commissioning, acceptance, and training
1. Installation and commissioning: Our service engineer will travel to the customer's facility as soon as the machine tool is delivered to complete installation and commissioning as well as on-site training.
2. Customers have the option of sending operators to our company for an initial training session that lasts around a week; following that, our business will provide on-site training at the customer's location during installation and commissioning.
3. Acceptance: Using the ex-factory accuracy inspection table that the supplier has provided, accuracy acceptance examines both the inspection items that can be examined at the customer's location and those that do not meet the inspection requirements, such as positioning accuracy, spindle taper hole accuracy inspection stick test, etc.
For inspection and acceptance, the buyer will dispatch workers to the supplier's factory.
After-sales service concept
1. Pre-sales service: Janssen's sales representatives will present clients with the finest processing alternatives, including tool and fixture selection, option configuration, and machine tool selection.
administration of lubricating oil, cutting fluids, and other services. offering turnkey projects in addition.
2. Maintenance response time: We have a service crew of up to 26 people and a fully working service van at our disposal. As soon as we receive the user's failure notification, we will respond within two hours.
3. Parts inventory: Janssen has a specialized production facility and a full stock of parts in Xiamen. Each office maintains stockpiles of frequently used parts to provide users with the fastest repair components.