User-friendly Gas Pressure Sintering Furnace (for cemented carbide, ceramics and other hard materials)
1.Tech details
Service life |
6000times / 20-years service life |
Useful space |
≥300×300×600mm/900mm/1200mm |
Max. Loading weight |
100kg(It depends on sintering product and loading space) |
Max. Designed temp. |
1800℃(Heating temperature) |
Max. Working temp. |
1750℃ |
Max. working pressure |
≤58bar |
Ultimate vacuum degree |
1Pa(After heating in a cold,empty,dry condition) |
Leakage rate (average value in 24h)
|
3pa/h(ultimate vacuum state, under empty cold,clean condition) |
Wax Collection rate
|
≥98% (Argon or Nitrogen dewaxing with 10kg wax absolutely, average not more than 3 times ) |
Heating rate |
8°C/min (in the case of vacuum and empty furnace, the room temperature rises to 1450°C, 600°C, 1000°C, and 1200°C can be kept for 40 minutes half way), full furnace≤5°C/min |
Pressuring time
|
≤20min.Time can be set(When gas source is kept around 130bar,pressurized to required pressure) |
Cooling time
|
≤4 hours( From 1450℃ to 100℃,water temperature≤28℃,50bar≤pressure≤58bar ) |
UPS time
|
Supply power to indicator and to control furnace when power-off, Keeping time≥60min |
Temp.measurement Mode
|
Duplex thermocouple,mutually redundant, stable and reliable |
Input gas allowed |
Ar, N2, H2 |
Furnace Body weight |
10 T |
The equipment is installed, debugged and accepted through remote guidance through the Internet. Under the premise of stable COVID-19 and unlimited travel, the seller can arrange personnel to install and debug on the buyer’s site. During the seller’s installation and debugging, the buyer will provide the buyer with free meals and accommodation for the debugging personnel in accordance with the international four-star standard.
The equipment is shipped to the buyer’s location. After the seller receives the buyer’s notice, both parties will unpack the package within one week and conduct a complete set of inspection and acceptance according to the equipment packing list, including equipment accessories, spare parts, random documents and technical documents, etc. Only when the acceptance is qualified should the installation of the equipment begin.
Conduct acceptance test according to technical documents after commissioning.
3.Training
We offer equipment training for the users. When the equipment is installed and commissioned at the user's site, the user's operation and maintenance personnel will be given some on-the-spot teaching in terms of the actual operation and maintenance training; Our technical personnel will help train 2 to 3 maintenance and operation workers in the following aspects: explaining the basic principles of equipment, maintenance knowledge, common fault causes and treatment methods