Climbing Formwork System by Crane In Wall Formwork Construction For High Towers
Climbing Formwork CB240 is a crane dependent climbing system and support structure widely used to pour high walls. It performs as a loading-bearing platform as well as a safe working platform. Depending on the length of the platform, the Climbing System is applicable to heights of more than 100 m over ground and allows a maximum formwork height of up to 5.40 m.
Advantages:
Platform width: 2.4m
Roll-back system: 70 cm with carriage and rack system
Finishing platform: for removing the climbing cone, polishing concrete surface etc.
Anchor system: should be pre-fixed into the formwork and left in the concrete after pouring.
Formwork: can be moved horizontally, vertically and tilted to meet site requirement.
Main platform: provide workers a safe working platform
Finishing platform: there is an access to the main platform by using a safety ladder.
![]() | 1. Climbing bracket
2. Main platform
3. Pouring platform
4. Finishing platform
5. Roll-back system
6. Push-pull prop
7. Vertical waling
8. Anchor system
9. Formwork
|