Fireproof Two-Story Prefab Beach Bungalow, Blue Home Beach Bungalows
Quick Detail:
Name | Wooden bungalow | Application | Wooden bungalow for holiday living |
Color | Yellow, white, etc depend on customer’s request | Feature | 1.quickly to assemble on site 2.good earthquake-proof 3.green, energy save 4.design for customers |
Material | light steel and other parts material | Certificate | CE,ISO,SAA,ETC |
Description:
Main structure: Light Gauge Steel
Wall cladding: ALC panel/fibre cement cladding+MGO board/gypsum board
Insulation material: glass wool or also EPS/XPS/PU sandwich panel
Ceiling material: MGO board/gypsum board
Roof: EPS sandwich panel/steel roofing/asphalt shingle
Flooring: laminate flooring/wooden/PVC carpet
Door: steel security door/WPC or wooden door
Window: aluminum alloy/PVC
Other fittings: toilet, washbasin, shower, kitchen, etc.
Lifetime: 100 years for structure
Applications:
the toilet, washbasin, shower, kitchen, etc.
Specifications
light steel framing Bali prefab wooden houses:
ISO standard light gauge steel for main structure.one or two also three floors available. fireproof, heat insulation, wind, and earthquake resistance.green, energy saving. economically.
Design code:
(1)AISI S100 North American Specification for the Design of Cold-Formed Steel Structural Members published by the American Iron and Steel Institute (AISI) in the United States.
(2)AS/NZS 4600 Australian/New Zealand Standard-Cold-formed steel structures jointly published by Standards Australia and Standards New Zealand.
(3)BS 5950-5 Structural use of steelwork in building-Part 5. Code of practice for the design of cold-formed thin gauge sections published by BSI in the UK.
(4)ENV1993-1-3 means Eurocode 3: Design of steel structures; Part 1.3: General rules, Supplementary rules for cold-formed thin gauge members.
Why Choose Light Gauge Steel Structure?
1)Lifetime for structure: 100 years.
2)Earthquake resistance: mix more than 8 grades.
3)Wind resistance:max 60m/s.
4)Fire resistance: all the materials used can be fire resistance.
5)Snow resistance: max 2.9KN/m²as required
6)Heat insulation:100 mm in thickness can match 1 m thickness of the brick wall.
7)High acoustic insulation:60db of exterior wall 40db of interior wall
8)Insect prevention: Free from the damages by insects, such as white ants
9)Ventilation: a combination of natural ventilation or air supply keep the indoor air fresh and clean
10)Packing and delivery: 140SQM/ 40'HQ container for structure only and 90SQM/ 40'HQ container for structure with decorating materials.
11)Installation: the average is one worker one day install one SQM.
12)Installation guide: dispatch engineer to guide on site.
Material Configuration:
No. | Item | Materials | Luxury house | No. | Item | Materials | Luxury house |
1 | Foundation | Fixing to Foundation | chemical bolt | 6 | Roof system | roofing | ceramic/asphalt shingle |
cushion tape between frame and foundation | asphalt tape | water-proof layer | the heavy-duty asphalt layer | ||||
2 | House Structure System | The main structure for the house | 1.15mm thick *89mm wide Steel frame | strength board | 15mm OSB board | ||
Floor Joist (if multi-stories) | 1.15mm steel joist | Insulation/batt | heavy duty glass wool | ||||
Connection | self-drilling stress | eaves board | 12mm MgO board | ||||
3 | Exterior Wall | Ext. wall Cladding | 50MM ALC PANEL or PU sandwich panel | downpipe system | PVC downpipe system | ||
Reinforce layer | 12mm OSB board | 7 | Kitchen and bathroom | Kitchen cabinet | high-quality cabinet | ||
Vapor barrier | DUPONT Vapor barrier sheet | wall cabinet | high-quality wall cabinet | ||||
Insulation/batt | heavy duty glass wool | countertop | stone countertop | ||||
inter of ext .wall | double 12mm plasterboard | Sink | high-quality stainless sink with faucet | ||||
4 | Interior Partition wall | siding | double 12mm plasterboard | toilet | high-quality toilet | ||
cornering | high quality plaster cornering | bathtub | high-quality bathtub | ||||
Skirting | solid wood and tile | shower | high-quality shower | ||||
5 | Floor System | subfloor for ground floor (Wet area ) | NULL | 8 | Doors and windows, plumbing | Exterior door | security door |
Subfloor for other floors ( Wet area ) | 20mm fiber cement board | windows | double glass Alum. Windows | ||||
flooring for ground floor (dry area) | wooden flooring | interior door | high-quality plywood door | ||||
flooring for ground floor ( wet area) | high-quality ceramic tile | hot&cold water pipe | high-quality PPR PIPE | ||||
Flooring for other floors (wet area) | high-quality ceramic tile | Downpipe | high-quality PVC downpipe | ||||
Flooring for other floors dry area | wooden flooring | 9 | Electrical system and multimedia | telephone cable | included | ||
Insulation | glass wool | TV. CABLE | included | ||||
The ceiling for dry area | 12mm plasterboard | internet cable | included | ||||
the ceiling for wet area | PVC ceiling | electrical cables | included | ||||
stairs (If have) | steel stairs with armrest | lighting | ceiling light | ||||
notice: | distribution box | Included | |||||
1 | EX.W mean EX.works, pls find an explanation from Wikipedia | switch | Included | ||||
2 | This price does not include foundation, cement works, and any other cost. | 11 | Others | INSTALLATION FEE | Optional | ||
3 | This price does not include the design fee. | SUPERVISOR | Optional | ||||
4 | This price does not include any furniture and others. | ||||||
5 | This price is only for listed materials | ||||||
6 | All electrical is based on Chinese standard equipment. | ||||||
7 | The total window area is no more than 15% of the building area. The ceiling height is calculated 2.5m. | ||||||
8 | The final price needs to be confirmed based on final drawings and order-confirm-letter. | ||||||
9 | If you have any questions, pls contact DEEPBLUE. |