3OZ Multilayer Industrial PCB Assembly
High TG HDI Industrial PCB Assembly Pcb Manufacturing Fast Multilayer Pcb Prototyping Service
PCBA Capability
SMT Lines | 13 Lines |
Capacity | 8 Million Placements Per Day |
Max Board Size | 680*550mm Smallest:0.25"*0.25" |
Min Components size | 0201-54 sq.mm (0.084 sq.inch),Long Connector,CSP,BGA,QFP |
Speed | 0.15sec/chip, 0.7sec/QFP |
Wave-Solder | Max.PCB Width:450mm |
Min.PCB Width:unlimited | |
Components Height:Top 120mm/Bot 15mm | |
Sweat-Solder | Metal Types:Part,Whole,Inlay,Side-step |
Metal Material:Copper,Aluminum | |
Surface Finish:Plating Au,Plating Silver, Plating Sn | |
Air Bladder Rate: less than 20% | |
Press-fit | Press Range:0-50KN |
Max.PCB Size:800*600mm | |
Assembly Types | SMT and Thru-hole |
Solder Type | Water Soluble Solder Paste, Leaded, and Lead-Free |
File Formats | Bill of Materials, Gerber Files, Pick-N-Place Files(XYRS) |
Type of Service | Turn-Key, Partial Turn-Kye, or Consignment |
Component Packaging | Cut Tape, Tube Reels Loose, Parts |
Turn Time | 1-15days |
Testing | XRAY Inspection, AOI Testing ICT, Flying Probe, Burn-in, Function Test |
FAQ
Q1:What is needed for the quotation?
·PCB: Quantity, Gerber file, and Technic requirements(material, surface finish treatment, copper thickness, board thickness,...)
·PCBA: PCB information, BOM, (Testing documents...)
Full assembly product: PCBA Information and product build information
Q2: Are you a manufacture?
Yes, we are. Warmly welcome to visit our factory at any time
Q3. Are my files safe?
Your files are held in complete safety and security. We protect the intellectual property of our customers in the whole process. All documents from customers are never shared with any third parties.
Q4; What is the delivery time?
Normal: 5-7 working days for samples, 7-25working days for bulk production.
For Urgent project: We can arrange preferential processing and control the delivery time as you request
Q5. Do you have MOQ?
There is no MOQ in Leadsintec. We are able to handle Small as well as large volume production with flexibility.
Q6: What is the payment term?
100%T/T in advance normally;50% deposit,50% balance by T/T before shipment
Q7: Shipping cost?
The shipping cost is determined by the destination, weight, packing size of the goods. Please let us know if you need us to quote you the shipping cost.