(KEYWORD:High-speed mounter/High-production SMT machine/flexible strip Pick and Place Machine)
Brand: | ETON | Warranty: | 1 year |
Model: | HT-T7 | Origin: | CHINA |
The Machine type:Pick and Place Machine |
Application:
HT-T7 suitable for any length of Flexible strip, such as 5m,10m,15m,20m,25m, 50m,etc. Also suitbale for BGA.
Features:
high-speed mounter for flexible strip |
Producing with 2-4 types of materials with high capacity |
Available for 5m, 50m or any length of flexible strip. |
16 nozzles for each mounting module, part A or part B can be mounted separately or synchronously. |
Exclusive patent technology: Group to pick and group to mount. |
Calibration automatically, high precision, available for RGB. |
Technical parameter:
HT-T7 Double module Technical Parameter | |
Dimension | |
Length | 2200mm |
Width | 2910mm |
Height | 1550mm |
Total Weight | 1600kg |
PCB | |
PCB Length Width | 250mm*any length |
PCB Thickness | 0.5-1.5mm |
PCB Clamping | Adjustable pressure pneumatic |
Mounting Mode | Group to take and group to mount |
Vision System | |
No. of camera | 5 Sets of imported camera Vision alignment, MARK correction |
Mounting precision | ±0.02mm |
Mounting Height | 〈15mm |
Mounting Speed | 100000-150000CPH |
Power | 220AC 50Hz |
Power Consumption | 5KW |
Conveyor Transmission | Belt drive |
Transmission Speed | >500mm/sec |
Air pressure | >5.0Kg/ CM² |
Electrical control | Independent research and development by ETON |
X.Y.Z Axis Driving | servo motor |
Details:
|
Two mounting modules
16 Nozzles and 32 Electric feeders for each mounting part
Attention:
1. Before using the Pick and Place machine, you must understand the basic parameters l of the placement machine;
2. Before running the Pick and Place machine, the operator should do a comprehensive inspection of the machine.
3. According to the boot operation sequence to implement the Pick and Place machine, there must have a detailed machine operation instructions;
4. It is necessary to conduct regular troubleshooting and maintenance work on the Pick and Place machine in a timely manner.
Logistics and delivery:
Transport: | By sea/Train/Airplane |
Packing: | Wooden box with vacuum package |
Lead Time: | Four weeks after payment |
After sales service