High capacity Blue and white bulb making mounter with 40000CPH for led light production
Production description:
1. Can mount minimum size 0402 components. And also can mount less than 22 MM high components. Including LED chips, resistors, capacitors, IC, shaped components, inductance, etc.
2. Suitable for small PCB products, Such as LED bulb. LED linear bulb, LED DOB bulb, LED street light, LED down-light, LED Driver and Small home appliance electronic boards, etc.
3. The optimal speed for LED lighting can reach 40000 CPH, suitable for new enter and middle LED manufacturer.
Machine main parameter:
System | Windows 7 |
Display | Touch screen monitor |
Input device | Keyboard,mouse |
PCB clamping | Pneumatic |
PCB size | Max:450*350mm Min:80*80mm |
Power | 380AC 50HZ |
Air supply | 0.4-0.6mpa(4-6kgf/cm2) |
Advantages of LED Pick and Place Machine:
Company profile:
1.We had building a long-term partnership with some strong factories!
2. We specialize in this field for 10 years.
3. We have our own professional designers.
4. We have 50,000 square meters of industrial park.
5. We can provide you with whole production line.
Application:
Apply to tube,driver,bulb,strip,lamp,panel,ceiling light,down light,screen,street light,etc.
Apply to mounting LED,capacitors,resistors,IC,shaped components etc.
Exhibition:
Our company participates in many exhibitions at home and abroad every year,
You will see ETON's booth in some well-known large-scale exhibitions in China, including large-scale exhibitions held in Shenzhen, Guangzhou, Chongqing, Shanghai and other places.
Service:
We can provide you with excellent service, we also have professional overseas engineers to your factory provide install, training service until you can operate the machine adroitly.
FAQ:
1) Do you have oversea after sale service?
We can offer technical support abroad. If you have any technical problem, our engineers will support you promptly.
2) How is the training?
After buying our machines, you can send your engineers to our factory, or we send our engineer to your factory, and then we will train your people to operate these machines.
3) It’s hard to use the machine?
No, not at all. For our previous clients, at most 5 days is enough to learn to operate the machines.
4) Does your machines have quality certificates?
We are high-tech enterprise with CE,SIRA,CCC ,ISO awarded as "Well-know brand" and many technology patents, and have rich experience(more than 8 years) in LED light production line program.
5) What’s the termsof payment? What about the trade term?
T/T is OK. You can choose FOB Shenzhen.