Specifications
Brand Name :
PVkingdom, LONGi, JinKo, Huawei
Model Number :
580W, 625W
Certification :
CE ROHS ISO
Place of Origin :
China
Price :
Negotiable
Payment Terms :
L/C, T/T
Supply Ability :
50KWP-5MWP
Description

The cement flat roofs of industrial buildings offer an ideal platform for deploying solar energy systems. These systems provide numerous benefits, ranging from reducing energy costs and carbon emissions to supporting sustainable operations and grid stability. By harnessing the power of the sun, industries can transform their rooftops from underutilized spaces into valuable assets, contributing to a more sustainable and resilient future.

Benefits of Rooftop Solar System on Industrial Buildings


  • Reduced Energy Costs:

Industrial facilities are often high energy consumers. A solar system can significantly lower monthly electricity bills, leading to substantial long-term cost savings and improved profitability.

  • Environmental Sustainability:

By harnessing solar energy, businesses reduce their reliance on fossil fuels, decreasing their carbon footprint and contributing to a cleaner, more sustainable environment. This aligns with growing corporate social responsibility initiatives and can enhance brand image.

  • Energy Independence:

Solar systems offer a degree of energy independence, reducing vulnerability to volatile energy prices and grid disruptions. This can ensure more stable operational costs.

  • Potential Revenue Generation:

In many regions, businesses can sell excess solar-generated electricity back to the grid through net metering programs, generating additional revenue.

  • Increased Property Value:

The addition of a solar power system can enhance the overall property value of the industrial building, making it a more attractive investment.

  • Incentives and Rebates:

Government incentives, tax breaks, and rebates for renewable energy installations can help offset the upfront costs of a solar system.

PVkingdom provides professional installation methods


Installing a solar power generation system on a cement flat roof offers significant advantages, but it requires careful planning and execution. PVkingdom will provide the most professional installation to ensure a safe, efficient, and long-lasting system.

I. Pre-installation Assessment and Planning:

Structural Integrity Check:

Importance: The most crucial first step is to assess the structural integrity of the cement roof. Ensure it can support the weight of the solar panels, mounting structures, and any associated equipment.

Process: Engage a qualified structural engineer to conduct a thorough assessment. They will evaluate the roof's load-bearing capacity, identify any weaknesses, and recommend necessary reinforcements if needed.

Precautions: Never proceed with installation without a professional assessment. Overloading a roof can lead to serious safety hazards and costly repairs.

Roof Condition Evaluation:

Importance: Check for existing damage, leaks, cracks, or degradation. These issues must be addressed before installation to prevent future problems.

Process: Inspect the roof membrane, flashings, and any penetrations. Repairs should be made promptly to ensure a watertight seal.

Precautions: Ignoring roof damage can lead to leaks, damage to the solar system, and reduced roof lifespan.

Sun Exposure and Shading Analysis:

Importance: Determine the optimal placement of solar panels for maximum sunlight exposure throughout the day. Identify any potential shading issues caused by nearby buildings, trees, or other obstructions.

Process: Use solar analysis tools and software to map sun paths and identify areas of optimal exposure. Consider the seasonal variations in sunlight angles.

Precautions: Shading can significantly reduce solar energy production. Choose a mounting system and panel placement that maximizes sunlight exposure.

System Design and Permitting:

Importance: Design a solar system that meets the specific energy needs of the building while adhering to local regulations and building codes.

Process: Work with a qualified solar installer to design a system that includes the right number and type of solar panels, inverters, and mounting structures. Obtain all necessary permits and approvals before starting the installation.

Precautions: Improper design can lead to an inefficient system and potential safety hazards. Failure to obtain proper permits can result in fines and delays.

II. Installation Methods:

Ballasted Mounting System:

Description: This method uses concrete blocks or other heavy weights to secure the solar panel mounting structures to the roof without penetrating the roof membrane.

Advantages: Minimal roof penetration, making it ideal for roofs with existing membranes. Quick and easy installation.

Disadvantages: Requires a roof that can support the additional weight. Not suitable for high-wind areas.

Process: Arrange the ballast blocks according to the manufacturer's instructions and secure the mounting frames to them.

Fixed Mounting System:

Description: This method involves directly attaching the mounting structures to the roof using fasteners that penetrate the roof membrane.

Advantages: Secure and stable, suitable for high-wind areas. Can be adjusted for optimal panel tilt angles.

Disadvantages: Requires penetration of the roof membrane, increasing the risk of leaks if not properly sealed. More time-consuming installation.

Process: Mark the locations for the mounting feet, drill pilot holes, install anchors, and secure the mounting structures to the roof using appropriate sealants to ensure waterproofing.

Hybrid Mounting Systems:

Description: Combining aspects of ballasted and fixed mounting, this method uses a lighter ballast with additional mechanical attachment to provide both stability and minimal roof penetration.

Advantages: Offers a balance of stability and minimal roof penetration, suitable for a wide range of roof types.

Disadvantages: Can be more complex to install.

Process: Follow the manufacturer's instructions carefully for installation, ensuring that all ballast and attachment points are secured properly.

Panel Placement and Wiring:

Description: Solar panels are installed onto the mounting structures and wired together in series or parallel configurations.

Process: Follow the panel and inverter manufacturer's guidelines for proper wiring, ensuring that all connections are secure and weather-proofed. Use appropriate conduit and wire management to protect the wiring.

Precautions: Incorrect wiring can lead to system malfunctions, safety hazards, and decreased performance. Consult with qualified electricians for this part of the installation.

Inverter and Electrical Connections:

Description: The inverter is installed, and the solar panel array is connected to the inverter. The inverter converts DC electricity from the panels into AC electricity that can be used by the building or fed back into the grid.

Process: Choose an appropriate location for the inverter (usually near the electrical panel). Connect the inverter to the solar array and to the electrical system using proper grounding and safety measures.

Precautions: Inverter connections must be performed by qualified electricians to ensure safety and compliance with electrical codes.

III. Key Precautions During Installation:

Safety First:

Use appropriate personal protective equipment (PPE) like safety glasses, gloves, hard hats, and fall protection equipment.

Work with a qualified and experienced solar installation team.

Follow all safety guidelines and procedures.

Ensure the installation area is clear of hazards.

Minimize Roof Penetration:

If possible, use a ballasted or hybrid mounting system to minimize penetrations of the roof membrane.

If using a fixed mounting system, ensure that all penetrations are properly sealed using high-quality sealants to prevent leaks.

Install proper flashing around all penetrations to direct water away from the openings.

Proper Load Distribution:

Ensure that the weight of the solar panels, mounting structures, and ballast is evenly distributed across the roof to prevent localized stress.

Consult a structural engineer to determine the maximum load that the roof can safely bear.

Weather Considerations:

Avoid installing during inclement weather (rain, high winds, snow, etc.).

Ensure that all equipment and materials are properly secured in case of sudden weather changes.

Wiring and Electrical Safety:

Use appropriate wiring, connectors, and conduits that are rated for outdoor use.

Double-check all electrical connections to ensure proper polarity, tightness, and grounding.

Consult a licensed electrician for all electrical wiring and connections.

Regular Inspections and Maintenance:

After installation, inspect the system regularly for any signs of damage, loose connections, or leaks.

Clean the solar panels periodically to remove dirt and debris that may reduce their efficiency.

Ensure that the mounting structures and all hardware are in good condition.

Send your message to this supplier
Send Now

Industrial Distributed Rooftop Solar System-Cement Flat Roof Type 1

Ask Latest Price
Watch Video
Brand Name :
PVkingdom, LONGi, JinKo, Huawei
Model Number :
580W, 625W
Certification :
CE ROHS ISO
Place of Origin :
China
Price :
Negotiable
Payment Terms :
L/C, T/T
Contact Supplier
video
Industrial Distributed Rooftop Solar System-Cement Flat Roof Type 1

PVkingdom (Chongqing) New Energy Co., Ltd.

Verified Supplier
2 Years
chongqing, chongqing
Since 2021
Business Type :
Agent, Exporter, Trading Company, Seller
Total Annual :
5500000-7000000
Employee Number :
50~100
Certification Level :
Verified Supplier
Contact Supplier
Submit Requirement