8 Lanes 8 Expectation Discharges Dates Sorting Machine High Output
Product Introduction
The Jinguoyuan 8-lanes date sorting machine is capable of handling various types of dates, including jujube and medjool. This advanced equipment can accommodate large, medium, and small sizes with high efficiency and precision, boosting productivity rates. Additionally, it comes with grading features that aid in identifying and sorting dates based on aspects like pecking, splitting, shrinkage, decay, and other defects for further categorization.
Introduction Video
Material Sortable
Jujube, Medjool dates
Product Specification
No. | Lanes | Output (t/h) | Voltage (V/Hz) | Power (kW) | Air Pressure (MPa) | Air Consumption (m3/min) | Dimension (LxWxH mm ) | Weight (kg) |
LF04-0808A | 8 | 1.8-2.2 | 380/50 | 7.5 | >0.6 | 1.6 | 21690*1400*2280 | 3150 |
Remarks: data takes jujube as an example. The output and air consumption change according to state of raw materials, finished materials and channels division. Above data for reference only.
Product Features
Certificates
Quality Management System Certificate, CE Certificate
Packaging & Shipment
Due to date sorting machine is very large, usually it will be module packed with large durable pallet and covered stretch film to ensure good condition during long-term ocean shipment. For other small parts, they're packed into multi-layer corrugated boxes.
All packages is aimed to protect the machine from any damaged during the complicated shipment.
Warranty
We provide 1-year warranty for our AI dates sorting equipment. In addition, spare and wear parts are available sent along with the shipment so it's easier to get the equipment at the best working status time and time.
Business Procedures
After Sale Services
FAQ
Q: How can I know your equipment suitable for our dates or not? Can you send a process video?
A: We accept dates samples and take videos during real processing, so you will have an obvious look at the effect to our dates sorting equipment. In addition, your visit to our manufacturing base is greatly recommended.
Q: What about the lead time?
A: Refer to our business procedures, it will take 15-30 days after contract signed and deposit received, namely after our proposal is agreed to cater your actual demands.
Q: Do you accept OEM branding?
A: Yes OEM branding is available but for distribution partners only.